Browse
Search
Agenda - 03-04-1998 - 9e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1998
>
Agenda - 03-04-1998
>
Agenda - 03-04-1998 - 9e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2013 3:33:28 PM
Creation date
7/21/2010 11:11:32 AM
Metadata
Fields
Template:
BOCC
Date
3/4/1998
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
9e
Document Relationships
Minutes - 19980304
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Water and Sewer Branch of the NC Division of Environmental <br />Health. <br />5. The community water system shall be constructed and the final <br />construction approved by the North Carolina Division of <br />Environmental Health. <br />B. Roads and Access <br />1. Westcott Court, Brampton Place, and Chilmark Circle shall be <br />constructed to standards of the North Carolina Department of <br />Transportation, within a 50 -foot right -of -way, and the <br />construction shall be inspected and approved by NCDOT. <br />OR <br />A letter of credit, escrow agreement, or bond shall be submitted <br />to secure construction of Westcott Court, Brampton Place, and <br />Chilmark Circle to the standards of the North Carolina Department <br />of Transportation. An estimate of the construction cost must be <br />prepared by a certified /licensed engineer or grading contractor <br />and submitted to the Planning and Inspections Department. The <br />financial guarantee must reflect 110% of that estimate and be <br />issued by an accredited financial institution licensed to do <br />business in North Carolina. <br />The document describing development restrictions to be recorded <br />with the Final Plat shall state that the financial guarantee will <br />not be released until the road construction has been inspected <br />and approved by NCDOT. <br />2. An erosion control plan for construction of the roads shall be <br />submitted by the applicant for review and approval by the Orange <br />County Erosion Control Division. <br />3. 10, by 70' sight triangles shall be shown at all intersections. <br />4. If a divided entrance is included in the final design, detail <br />drawings shall be submitted to and approved by the North Carolina <br />Department of Transportation. <br />,0 <br />5. All laWshall`access onto the new subdivision roads. This <br />restrl'ctiow. shall be stated in a document describing development <br />restrictions and requirements to be prepared by Planning Staff <br />and recorded concurrently with the Final Plat. <br />6. Approved street _name signs shall be erected at the intersection <br />of streets -as -- required in Section IV- B- 3 -c -12 of the Orange <br />- - County-Subdivision-.Regulations- Evidence shall be submitted by <br />the applicant that the sign is in place or a copy of the receipt <br />for purchase of the sign shall be submitted to the Planning <br />Department. <br />t <br />5 <br />Public Water and Sewer Branch of the NC Division of Environmental <br />Health. <br />5. The community water system shall be constructed and the final <br />construction approved by the North Carolina Division of <br />Environmental Health. <br />B. Roads and Access <br />1. Westcott Court, Brampton Place, and Chilmark Circle shall be <br />constructed to standards of the North Carolina Department of <br />Transportation, within a 50 -foot right -of -way, and the <br />construction shall be inspected and approved by NCDOT. <br />OR <br />A letter of credit, escrow agreement, or bond shall be submitted <br />to secure construction of Westcott Court, Brampton Place, and <br />Chilmark Circle to the standards of the North Carolina Department <br />of Transportation. An estimate of the construction cost must be <br />prepared by a certified /licensed engineer or grading contractor <br />and submitted to the Planning and Inspections Department. The <br />financial guarantee must reflect 110% of that estimate and be <br />issued by an accredited financial institution licensed to do <br />business in North Carolina. <br />The document describing development restrictions to be recorded <br />with the Final Plat shall state that the financial guarantee will <br />not be released until the road construction has been inspected <br />and approved by NCDOT. <br />2. An erosion control plan for construction of the roads shall be <br />submitted by the applicant for review and approval by the Orange <br />County Erosion Control Division. <br />3. 10, by 70' sight triangles shall be shown at all intersections. <br />4. If a divided entrance is included in the final design, detail <br />drawings shall be submitted to and approved by the North Carolina <br />Department of Transportation. <br />,0 <br />5. All laWshall`access onto the new subdivision roads. This <br />restrl'ctiow. shall be stated in a document describing development <br />restrictions and requirements to be prepared by Planning Staff <br />and recorded concurrently with the Final Plat. <br />6. Approved street _name signs shall be erected at the intersection <br />of streets -as -- required in Section IV- B- 3 -c -12 of the Orange <br />- - County-Subdivision-.Regulations- Evidence shall be submitted by <br />the applicant that the sign is in place or a copy of the receipt <br />for purchase of the sign shall be submitted to the Planning <br />Department. <br />
The URL can be used to link to this page
Your browser does not support the video tag.