Orange County NC Website
24 ~ <br />3. Deliverables: To provide the master loading program, 3.5" diskettes and CD Rom with data <br />entered, and training of personnel with system operation. <br />ion Complete Inspection including sub-surface condition of all Low Slope Roofs (LSR) <br />for the SUM of $ 21.742.55 <br />i n Complete Inspection including sub-surface condition for roofs that may be insulated <br />for the SUM of $ 20.518.92 <br />Option III Complete Inspection without sub-surface condition inspected <br />for the SUM of S 17.990.00 <br />NOTE: Wa nxommend Option III based upon the fact that roofs that have failed or are not <br />insulated and of a very small size and have no reason to have asub-surface inspection. <br />Their condition will categorize them. Only those roofs that qualify for repair or <br />restoration should be surveyed.to determine if they stay in those categories: <br />We will be able to start inspection within three weeks after receipt of purchase order. It will <br />take a minimum of 12 dry working days for inspection to be completed. Therefore, we would <br />estimate a turn around time of 30 working days to complete project. <br />Respectfully submitted, <br />H. Hamblen <br />Tremco <br />CC: Pamela I~.7ones; Director <br />Oranga F ~ G Services <br />Bill PayrKer; 'F`rees-- <br />