Orange County NC Website
Jo:,*o&*p +ay The Public Facilities Group <br />and E5k-� P.C. <br />UNrrARY SYSTMO APPROACH <br />A&-g dim* The USA Wiwi <br />THE JOHN5TON COUNTY BOARD OF EDUCATION <br />KErORT OF NEGOTIATIONS BASED ON 5FECIAL LEGISLATION - F15 740 <br />June 18.1997 <br />• The hiitent of the special legislation was to use the experience of designing and building the <br />first model school and allow the USA Team to Improve the desigm to evaluate the costs and <br />to expedite the delvary of the second model school. <br />• The first USA made( school. Glendale Keny Elementary was compsrIt&* bid Jun* 13,1996 and <br />consists of 76.959 enclosed 94 ft. with a m mx mum student capacity of 600. <br />• The second USA model W a larger Amnentary school at McGas Crossroads and conalsts of <br />82.238 socks" set ft, (sm increase of 5,279"ft.) with a numk Hum student capacity of 913. <br />GENERALCON5TRUCTION <br />Da W"v Jaw Seen Cartroc11" Co. Raleig. NC <br />MECKANICAL CONSTRWTION <br />• Fos' rrpe HVAC 9"tan <br />• Ewa Mme Ohmt Conntm System <br />Central Heatk4 & Air Coeditwwmq. Klwca% NC <br />ELECTRNCAL CONSTRUCTION <br />rltt Electric. Ina. cmvw wu Nc <br />FWN VNG CONSTRUCTI0N <br />Britt rlwi,iny inc. mism NC <br />TOTAL WWNG CO5T5 <br />FKST MODEL USA K -5 <br />SECOW MODEL USA K-3 <br />06ndals Keniy <br />76,959 g4 Ft. <br />Did Juw 13.1996 <br />McGee's Crossroads <br />82.236 34 Fl.. <br />Nyotiated June 16. 1997 <br />$3,713.100 W.25/e.f. <br />$3.980.300 $48.401e1. <br />$747,700 $9.72/s.f. <br />$115.275 $t5o /s.f. <br />$769,770 49.36 /s.f. <br />$121.270 5147 /s.f. <br />$561.100 $7.29 /s.f. <br />$469,100 S&95/e1. <br />$234,000 $ 3.04/91. <br />$262.000 $ 3.19 /0. <br />$8.371.175 ET�.�Or<5.t. <br />35.622.44000.37%S.T. <br />KNTCh'EN EMIPMENT & N5TALLATION <br />$177,695 $ 231 191. <br />$173.695 <br />Ma"Sta "V Orem / Edward Don. Kale ok NC <br />• 5itework is not included because the Glendale Kerry site is 25 Acres and the McGee's <br />Crossroads site is 52 acres and will contain both elementary and middle schools. The McGee's <br />Crossroads sitework is scheduled to be competitively bid June 30,1997. <br />