Browse
Search
1998 S Purchasing - - Warren Hay Mechanical Contractor's Inc - Court Street Annex HVAC Replacement 04-07-1998-9g
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
1990's
>
1998
>
1998 S Purchasing - - Warren Hay Mechanical Contractor's Inc - Court Street Annex HVAC Replacement 04-07-1998-9g
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2012 9:29:43 AM
Creation date
7/20/2010 10:39:11 AM
Metadata
Fields
Template:
BOCC
Date
4/7/1998
Document Relationships
Agenda - 04-07-1998 - 9g
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\1990's\1998\Agenda - 04-07-1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 6 <br />FINAL PAYMENT <br />Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when (1) <br />the Contract has been fully performed by the Contractor except for the Contractor's responsibility to correct nonconforming <br />Work as provided in Subparagraph 12.2.2 of the General Conditions and to satisfy other requirements, if any, which necessarily <br />survive final payment; and (2) a final Certificate for Payment has been issued by the Architect; such final payment shall be made by <br />the Owner not more than 30 days after the issuance of the Architect's final Certificate for Payment, or as follows: <br />ARTICLE 7 <br />MISCELLANEOUS PROVISIONS <br />7.1 Where reference is made in this Agreement to a provision of the General Conditions or another Contract Document, the ref- <br />erence refers to that provision as amended or supplemented by other provisions of the Contract Documents. <br />7.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, or in <br />the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located. <br />(Insert rate of interest agreed upon, ij any.) <br />(Usury laws and requirements under the Federal Truth in Lending Act, similar state ar:d local consumer credit laws and other regulations at the Owner's mid <br />Contractor's principal places of business, the location of the Project and elsewhere may ajject the validity ojth. is provision. Legal advice should be obtah:ed <br />with respect to deletions or modifications, and also regarding requirements such as written disclosures or wai[~ers.) <br />7.3 Other provisions: <br />ARTICLE 8 <br />TERMINATION OR SUSPENSION <br />8.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of the General Conditions. <br />8.2 The Work may he suspended by the Owner as provided in Article 14 of the General Conditions. <br />AIA DOCUMENT A101 • OW'NF.K-CONIRACI'OR AGREE.~1EN'I' • TWELP"I'tl F.DI"CIO ALAS • Glysi, <br />rtle ,~~teku:.as l:arl~ I-re of a,kalrrf:crs. I -i; ve~~ ti t~kK .A~~f~.~l ~e. ~ vc_. u~.-„rll~cro~. t~_c _>n[[[a, A101-1987 5 <br />WARNING: Unlicensed photocopying violates U. S. copyright laws and is subject to legal prosecution. <br />
The URL can be used to link to this page
Your browser does not support the video tag.