Browse
Search
1998 S Purchasing - WOOLPERT LLP-Efland Cheeks Community School Park Boundary and Topographic Survey Woolpert LLP
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
1990's
>
1998
>
1998 S Purchasing - WOOLPERT LLP-Efland Cheeks Community School Park Boundary and Topographic Survey Woolpert LLP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2012 9:28:25 AM
Creation date
7/20/2010 10:13:30 AM
Metadata
Fields
Template:
BOCC
Date
4/7/1998
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
9d
Document Relationships
Agenda - 04-07-1998 - 9d
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\1990's\1998\Agenda - 04-07-1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
four sets of the design development documents to the Owner for final review and <br />comment. <br />2.2.6 The Consultant shall receive written conditional approval from the Owner for the <br />design development documents prior to beginning the construction documents phase. <br />2.3 Construction Documents Phase <br />2.3.1 Based on the approved design development documents authorized by the Owner, the <br />Consultant shall prepare, for approval by the Owner, construction documents consisting <br />of drawings and specifications setting forth in detail the requirements for the <br />construction of Phase-I of the project. <br />2.3.2 The construction plans base sheets will be drawn at 1"=50'-0" or other appropriate <br />scale. The documents may include final layout, grading, erosion control plan, utilities, <br />specialty areas, landscape plans, in addition to construction design details or other <br />elements as may be appropriate based upon the scope of services. <br />2.3.3 The floor plans for any structures included in the Phase-I portion of the project <br />Construction Document Phase will be drawn at 1/4" = 1' or other appropriate scale <br />and will include final foundation, floor, roof and framing plans in addition to elevation, <br />sections, construction design details, or other elements as may be appropriate for the <br />construction of the buildings. <br />2.3.4 The Consultant shall prepare the specifications setting forth in detail the requirements <br />for the construction of each project. The specifications shall include the necessary <br />bidding information, bidding forms, bonding information, add alternates, contract and <br />maintenance bond, and the conditions of the contract as required by the Owner. <br />2.3.5 The Consultant shall be diligent in appraising himself of all local, state, and federal <br />codes which may pertain to this project. The Consultant shall file the required <br />documents for the approval of governmental authorities having jurisdiction over the <br />project. If required, the Consultant will submit the appropriate documents to the North <br />Carolina State Construction office and The North Carolina Department of Insurance. <br />Any necessary fees shall be paid by the Owner. <br />2.3.6 The Consultant shall be responsible for developing plans and specifications for <br />appropriate water service, sanitary sewage service and electrical service. The plans <br />shall be submitted to the Owner for approval. The Consultant shall also be responsible <br />for designing erosion control, storm drainage, detention (if required), retention, and <br />other plans necessary for implementation of the elements defined in this contract. <br />2.3.7 The Consultant shall keep the Owner informed of any changes in requirements or in <br />construction materials, systems or equipment as the drawings and specifications are <br />being developed. <br />2.3.8 The Consultant shall prepare quantity take-off of items and shall advise the Owner of <br />any adjustments to previous Opinions of Probable Construction Costs indicated by <br />changes in requirements or general market conditions. <br />2.3.9 The Consultant has no control over the cost of labor, materials, equipment or services <br />furnished by others, or over the contractor(s)' methods of determining prices, or over <br />competitive bidding, or market conditions. The Consultant's Opinions of Probable <br />Construction Cost provided are to be made on the basis of his experience and <br />qualifications and represent his best judgment as an experienced and qualified <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.