Browse
Search
1998 S Purchasing - WOOLPERT LLP-Efland Cheeks Community School Park Boundary and Topographic Survey Woolpert LLP
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
1990's
>
1998
>
1998 S Purchasing - WOOLPERT LLP-Efland Cheeks Community School Park Boundary and Topographic Survey Woolpert LLP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2012 9:28:25 AM
Creation date
7/20/2010 10:13:30 AM
Metadata
Fields
Template:
BOCC
Date
4/7/1998
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
9d
Document Relationships
Agenda - 04-07-1998 - 9d
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\1990's\1998\Agenda - 04-07-1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task-II <br />The Phase-I portion of the project will be bid and constructed. The Consultant will provide <br />bidding assistance and periodic construction administration throughout the duration of the first <br />phase of the project, under this contract. <br />This work will be performed as described in Paragraphs 1. l through 2.3.12. In addition Section IV <br />identifies the services associated with Additional Services, Section V identifies the Schedule and Section <br />VII identifies the Fee for the project. <br />I. - T~-~ <br />PHASE-I CONSTRUCTION DOCUMENTS, <br />2.1 Schematic Design Phase <br />2.1.1 The Consultant shalt review with the Owner the improvement programs and budgets set <br />for the proposed Phase-I portion of the project. <br />2.1.2 Upon a thorough review of the master plan information, the Owner shall provide to the <br />Consultant a written statement of any comments and possible design requirements and <br />or changes to be made by the Consultant to the Phase-I construction document design <br />package. <br />2.1.3 Orange County shall provide the Consultant with the appropriate site mapping <br />consisting of topography at a 2 foot contour, property boundary information, and site <br />utilities. This mapping shall be prepared using acomputer-aided design and drafting <br />(CADD) system. This mapping shall be use in the preparation of the computer- <br />generated Construction Documents. <br />2.2 Design Development Phase <br />2.2.1 Based on the previously approved planning documents, the Consultant shall prepare, <br />for approval by the Owner, the design development documents consisting of drawings, <br />outline specifications, and other documents to fix and describe the size and character of <br />the proposed improvements. The Phase-I plans will be drawn at 1"=50'-0", or other <br />appropriate scale, and will show the final layout of all facilities including the general <br />layout plan, preliminary grading, utilities, and landscape design. <br />2.2.2 The Consultant will prepare an updated Opinion of Probable Construction Cost <br />associated with the proposed improvements. These deliverables will be based on more <br />detailed information provided by the design development documents and on current unit <br />costs for the area. <br />2.2.3 At intervals appropriate to the progress of the design development phase, the <br />Consultant will schedule meetings with the Owner to review the documents and visit <br />the site to field check the design. Four sets of documents will be provided to the Owner <br />by the Consultant prior to each meeting. <br />2.2.4 Upon completion of each review session, the Owner shall provide to the Consultant a <br />written statement of their comments and possible revisions to be made by the <br />Consultant. <br />2.2.5 The Consultant will address all the review comments of the Owner and make the <br />necessary revisions to the design development documents. The Consultant shall submit <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.