Orange County NC Website
<br />professional familiar with the construction industry; but the Cotuultant cannot and does <br />not guarantee that proposals, bids, or actual project construction cost will not vary from <br />Opinions of Probable Cost prepared by him. if prior to tl~e bidding phase the Owner <br />wish greater assurance as tv construction cost, the Owner shall employ an independent <br />cyst estimator. <br />3.1U At intervals appropriate to t}ie progress of the construction document phase, the <br />Consultant will schedule meetings with the Owner to review tl~e documents. A <br />preliminary and final submittal of two sets of the construction documents wilt be <br />provided by the Consultant prior tv meeting. <br />3. t 1 Upon completion of each review session, the Owner shall provide to the Consultant a <br />written statement of their comments along with aced-lined set of drawings and <br />specifications. <br />3.12 The Consultant will address all the review comments of the Owner until they are in <br />satisfactory agreement with the construction documents. <br />K~ <br />(:UN51'RUC;"I'lUN 13IUlliNG .~ AUi-•[INISZ'RA1'lUN <br /> doling I'hasc <br /> 1. t The Consultant, following the Owner's approval of the construction documents and the <br />e latest Opinion of Construction Cost, shall assist the Owner in obtaining bids and in <br />~f the awarding and preparing the Construction Contracts for the park complex. <br /> 1.2 1'he Consultant shall provide for alternates in the bidding of this phase of work. The <br />truction alternates shall be in association with the base bid. This information shall be part of the <br />and sheci(icatiotr package anct will be provided to the contractor with the construction <br />clots' document package. • <br />rltant <br /> 1.3 1'l~c Consultant shall he responsible for reproductions of drawings and specificatioru to <br />ons he distributed to contractors during the bidding phase of the project. <br /> 1.4 '1'hc Consultant will be available during the bidding period to interpret or provide <br />ect clarificaticm of the drawings and specifications to the bidders. Clarifications will he <br />he documented in writing with copies sent to the bidder and to the Owner. <br /> 1.5 The Consultant shall assist the Owner in conducting apre-hid meeting with the bidders <br /> to clarify the requirements for this project. <br />m by <br />:ite and I.G '1'hc Consultant shall attend the bid opening on behalf of the Owner and will review all <br />_d to the bids received. <br />I belief, <br /> 1.7 't'he Consultant wilt review each bid in terms of the proposal, proposal price sheets. bid <br />.al guaranty bond, experience statement, and affidavits and will niake a written <br />er the recommendation tv Award of Contract for each prime bid to the Owner. <br />~ Ic prig <br />for nrstructicm Administration ('base <br />j. 2. I "1'he Ccrostntctic~n Administration Phase will commence with the Award of Construction <br />:cntation ('un~racty and will Icrntinalc after the final Certificate fur 1'aynunt is approved by the <br />-4- <br />