Browse
Search
Agenda - 04-07-1998 - 9d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1998
>
Agenda - 04-07-1998
>
Agenda - 04-07-1998 - 9d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2010 4:16:24 PM
Creation date
7/19/2010 4:16:22 PM
Metadata
Fields
Template:
BOCC
Date
4/7/1998
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
9d
Document Relationships
1998 S Purchasing - WOOLPERT LLP-Efland Cheeks Community School Park Boundary and Topographic Survey Woolpert LLP
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\1990's\1998
Minutes - 19980407
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />professional familiar with the construction industry; but the Cotuultant cannot and does <br />not guarantee that proposals, bids, or actual project construction cost will not vary from <br />Opinions of Probable Cost prepared by him. if prior to tl~e bidding phase the Owner <br />wish greater assurance as tv construction cost, the Owner shall employ an independent <br />cyst estimator. <br />3.1U At intervals appropriate to t}ie progress of the construction document phase, the <br />Consultant will schedule meetings with the Owner to review tl~e documents. A <br />preliminary and final submittal of two sets of the construction documents wilt be <br />provided by the Consultant prior tv meeting. <br />3. t 1 Upon completion of each review session, the Owner shall provide to the Consultant a <br />written statement of their comments along with aced-lined set of drawings and <br />specifications. <br />3.12 The Consultant will address all the review comments of the Owner until they are in <br />satisfactory agreement with the construction documents. <br />K~ <br />(:UN51'RUC;"I'lUN 13IUlliNG .~ AUi-•[INISZ'RA1'lUN <br /> doling I'hasc <br /> 1. t The Consultant, following the Owner's approval of the construction documents and the <br />e latest Opinion of Construction Cost, shall assist the Owner in obtaining bids and in <br />~f the awarding and preparing the Construction Contracts for the park complex. <br /> 1.2 1'he Consultant shall provide for alternates in the bidding of this phase of work. The <br />truction alternates shall be in association with the base bid. This information shall be part of the <br />and sheci(icatiotr package anct will be provided to the contractor with the construction <br />clots' document package. • <br />rltant <br /> 1.3 1'l~c Consultant shall he responsible for reproductions of drawings and specificatioru to <br />ons he distributed to contractors during the bidding phase of the project. <br /> 1.4 '1'hc Consultant will be available during the bidding period to interpret or provide <br />ect clarificaticm of the drawings and specifications to the bidders. Clarifications will he <br />he documented in writing with copies sent to the bidder and to the Owner. <br /> 1.5 The Consultant shall assist the Owner in conducting apre-hid meeting with the bidders <br /> to clarify the requirements for this project. <br />m by <br />:ite and I.G '1'hc Consultant shall attend the bid opening on behalf of the Owner and will review all <br />_d to the bids received. <br />I belief, <br /> 1.7 't'he Consultant wilt review each bid in terms of the proposal, proposal price sheets. bid <br />.al guaranty bond, experience statement, and affidavits and will niake a written <br />er the recommendation tv Award of Contract for each prime bid to the Owner. <br />~ Ic prig <br />for nrstructicm Administration ('base <br />j. 2. I "1'he Ccrostntctic~n Administration Phase will commence with the Award of Construction <br />:cntation ('un~racty and will Icrntinalc after the final Certificate fur 1'aynunt is approved by the <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.