Orange County NC Website
t'p~, <br />initial start-up or testing, adjusting and balancing, preparation of operation and <br />maintenance manuals, training personnel for operation and maintenance and <br />cottsuitation during operation. <br />4.1. tU Providing services after approval by the Owner of the final project certificate for <br />payment, or in the absence of a final project certificate for payment, more than b0 days <br />after tltc date of substantial completion of the project. <br />. " 4.1.11 Preparing to service or serving as a witness in connection with any public hearing, <br />arbitration proceeding or legal proceeding. <br />4.1.12 Providing rendered drawing or models of the park project. <br />4.1.13 Providing any additional printing or reproduction of drawings and specifications not <br />already stipulated in Section I & II. <br />4.1.14 Providing additional services resulting from re-bidding of the project. <br />4.1.15 Providing any other services not otherwise included in this Agreement or not <br />customarily firrrtislted in accordance with generally accepted architectural/engineering <br />practice. <br />4.1.16 Providing any aerial mapping or property /topography survey information. <br />t V. - SC~1~U~JLT <br />5.1 The Consultant sltail perform the services as outlined in this proposal as expeditiously as is <br />consistent with professional skill and care and the orderly progress of the project. Reasonable <br />extensions of time for trttforescert or unavoidable delays may be made by mutual consent of cite <br />parties involved. In the event of excessive delays of the Consultant's work, at no fault of his <br />vwn, which may result into increased cost to the Consultant, the Consultant's fee may be re- <br />negotiated. The re-negotiated fee would be determined by mutual agreement between the <br />Uwner and the Consultant. For the purpose of this Agreement, the following schedule is <br />projected, beginning wide the date that the Consultant receives written notice to .proceed from <br />the Owner to providing plans and specification ready for bid. In addition, dates have been <br />determined for each phase of cite project for which fife Consultant's fees sitaii be valid without <br />need of rc-ttcgotiatiort dtte to unforeseen time delays. <br />5.2 Document Preparation Schedule <br />T~.S~I <br />• Notice to Proceed .................................. March 24, 1998 <br />• Start-up Meeting with O~~tter .......................... March 3U, 1998 <br />• CU Schematic/Design Development Pltase ........ March 31, 1998 -May 4, 1998 <br />• Uwrter Review, Contntertts ............................ May 5-t2, 1998 <br />• Construction i)octrntent Pltase-I ................ May 13, 1998 -July 13, 1998 <br />• Uwitcr ttcvicw ....................................July 14-21, 1998 <br />-R- <br />