Orange County NC Website
—Please return this copy to <br /> Clerk to the Board's office for PAF <br /> [Departmental Use Only] <br /> TITLE Blackwood Farm Stabilization <br /> FY 2009-10, 2010-11 <br /> NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT UNDER$250,000.00 <br /> ORANGE COUNTY <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called "Agreement"), made as of the 24th <br /> day of May, 2010, by and between Clark Poe Construction, Inc., (hereinafter called the "Contractor"), and <br /> Orange County, a body corporate and politic and a political subdivision of the State of North Carolina, <br /> (hereinafter called the "Owner"). <br /> WITNESSETH: <br /> That the Contractor and the Owner, for the consideration herein named, agree as follows: <br /> 1. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials, and perform all of the work <br /> required by this Agreement within the time period stipulated in a written Notice-to-Proceed to be <br /> executed by the Contractor and Owner and in accordance with the following enumerated documents, <br /> which are attached hereto and made a part hereof as if fully contained herein: <br /> a. Construction Drawings prepared by R.B. Engineering, Inc. (Sheet 1-16 dated April 30, <br /> 2009.) <br /> b. Written specifications prepared by the project engineer. <br /> c. Clark Poe Construction, Inc. proposal dated April 7, 2010 which fully describes the work to <br /> be performed, such work hereinafter called the"Work". <br /> d. Other documents as follows: <br /> 2. TERM AND SCHEDULING <br /> a. The Contractor agrees to commence work on the date of the executed original of this <br /> Agreement and agrees to complete fully all Work included by October 30, 2010. <br /> b. Time is of the essence with respect to all dates specified in the Contract Documents as <br /> Completion Dates. <br /> c. The Contractor shall perform the Work in the time, manner and form required by the <br /> Contract Documents and as stipulated in a written Notice-to-Proceed to be executed by the <br /> Contractor and Owner. <br /> d. It is expressly understood that the Owner will employ other contractors to perform work as <br /> a part of the Project whose work will be performed simultaneously and sequentially with <br /> the performance of the Work by the Contractor. It shall be necessary for the Contractor to <br /> coordinate its activities with such other contractors, particularly with respect to access to <br /> work areas, storage of materials and other common facilities. <br /> Revised June 2010 1 <br />