Browse
Search
Agenda - 05-06-1998 - 8d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1998
>
Agenda - 05-06-1998
>
Agenda - 05-06-1998 - 8d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2013 8:31:49 AM
Creation date
7/13/2010 4:29:37 PM
Metadata
Fields
Template:
BOCC
Date
5/6/1998
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8d
Document Relationships
1998 NS Housing Contract Award to Taylor Home Improvements for Hardcastle Property and Holeman Property
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\1990's\1998
Minutes - 19980506
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />Pauline Hohlman <br />Box 415 Gasines Chapel Road <br />Efland, NC 27243 <br />563 -6042 <br />ROOF: <br />1. Remove the roof covering to the sheathing. Install 1/2" CDX plywood on the main <br />part of the house and front porch Install 151b. felt, aluminum drip edge, and three tab shingles. Step <br />flash the addition roofs. Install flashing and counter flashing on the chimney. <br />Install a ridge vent ventilation system. Install new plumbing boots. <br />2. Replace approx. 100 sq. feet of sheathing. <br />EXTERIOR: <br />1. Install a crawl space access door with galvanized hinges and locking hasp. <br />2. Install four foundation vents. <br />3. Remove the aluminum siding. Install 3/8 inch foam insulation. Install <br />vinyl siding and trim. Install vinyl soffitt, install aluminum fascia and door and <br />window trim. <br />4. Install aluminum, continuous gutter and downspouts. Install splashblocks under <br />each downspout. <br />5. Repair two window sills. <br />INTERIOR: <br />WINDOWS <br />1. Remove the existing windows including the upstairs windows. Install vinyl replace- <br />ment windows and trim. <br />LIVING ROOM: <br />Remove the existing front door. Install a 6 panel metal insulated door unit. Reframe <br />the opening to accommodate a standard size door. Install a deadbolt and lockset to be <br />keyed the same. Install a peephole and door bump. Install matching trim <br />2. Install a full view, wood core, seamless aluminum storm door with pneaumatic <br />closurer and vinyl sweep. <br />3.. Remove the existing ceiling tile and crownmold. Install 1/2 inch sheetrock. Tape <br />and finish the sheetrock smooth. <br />4. Install 13/4 inch bed mold. <br />
The URL can be used to link to this page
Your browser does not support the video tag.