Browse
Search
Agenda - 05-06-1998 - 8d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1998
>
Agenda - 05-06-1998
>
Agenda - 05-06-1998 - 8d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2013 8:31:49 AM
Creation date
7/13/2010 4:29:37 PM
Metadata
Fields
Template:
BOCC
Date
5/6/1998
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8d
Document Relationships
1998 NS Housing Contract Award to Taylor Home Improvements for Hardcastle Property and Holeman Property
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\1990's\1998
Minutes - 19980506
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br />Clara Hardcastle <br />1001 Frazier Rd. <br />Efland, NC <br />563 -6776 <br />Feb. 17, 1998 <br />EXTERIOR: <br />1. Remove the existing porch flooring, Install T &G, pine flooring. Paint the flooring with <br />two coats of porch and deck enamel. Paint to cover completely. <br />2. Paint the front porch ceiling with two coats of semigloss latex paint. Paint to cover <br />completely. <br />3. Install a wood core, seamless, aluminum storm door with pneumatic closurer and <br />vinyl sweep at the front entrance. <br />4. Install an custom made aluminum storm door with a pneaumatic closurer on the <br />rear entrance <br />WINDOWS: <br />1. Remove the existing windows on the rear porch. Install vinyl, insulated, <br />replacement windowsand trim. <br />FRONT AND REAR BEDROOMS: <br />1. Frame a 4 foot by 2 foot i.s. closets. Install 1/4 inch paneling on the framing. <br />Install 1 x 12 shelving, brackets and closet rods. Install crown mold and base <br />board. <br />LAUNDRY ROOM AND BATH: <br />1. Remove the existing floor to the floor joists. Install 1/2 inch exterior grade plywood <br />subfloor, 5/8 inch exterior grade plywood and 1/4 inch luan plywood finish floor. <br />Prep the floor for vinyl. Install vinyl floor covering, baseboard, shoemold and <br />metal trim. Vinyl allowance to be $14 /yd. <br />PAINT: <br />1. Paint the front bedroom ceiling with ceiling white latex. Cover the water stains. <br />Paint the bath walls, ceiling and trim with semigloss latex. <br />PLUMBING: <br />1. Install a washerless faucet and spray on the kitchen sink. <br />
The URL can be used to link to this page
Your browser does not support the video tag.