Orange County NC Website
J <br />i <br />seams. Sand smooth and prepare the walls for paint. <br />6. Paint the ceiling with ceiling white latex, the walls and trim with semigloss latex <br />paint. <br />RIGHT/REAR BEDROOM: <br />1. Paint the ceiling with ceiling white latex and the trim with semigloss latex. <br />2. Install carpet and pad. Carpet allowance to be $14 /yd. <br />3. Remove the existing bed mold. Install all new bed mold. <br />UPSTAIRS: <br />1. Install an attic access . <br />BATH: <br />1. Paint the bath with semigloss latex. Paint to cover completely. <br />2. Install a Type - 32 handrail on both the left and right sides of the commode. <br />ELECTRIC: <br />1. Install a 200 amp service, meter center, mast and weatherhead <br />2. Install new fixtures and switches in the front four rooms, exterior. stairwell and <br />upstairs rooms and install three outlets per room on the first floor. <br />3. Install GFI outlets in the kitchen and bath. <br />4. Install electric smoke detectors with flashing lights on the first floor and an electric <br />smoke detector with flashing lights wired to the first floor in the attic.Install strobe <br />lights in the kitchen and front bedroom. System to be a Gentcec 710CS with a <br />S 120 remote and a Audio Alram Transmitter or equivalent. Install an electric doorbell <br />with strobe lights in the kitchen and bedroom. <br />6. Install a three speed, reversible fan with a light in the kitchen. <br />INSULATION: <br />1. Install R -19 insulation in the crawl space. <br />2. Install R -30 insulation in the attic. <br />3. Install a vapor barrier in the crawl space. <br />11 <br />