Orange County NC Website
~_~ <br />1. znstall extension to pump shaft. <br />2. Install siphon to control downstream flow. <br />3. Modify existing trash guards at pump intake. <br />The measures would seek to conserve and provide for a safe water ~~ <br />supply. The total cost would be $21,000 (matching funds: State <br />$10,500, Town of Hillsborough $10,500). <br />Cor oration Lake <br />1. Install a six inch meter ($2,500)- at the point of the inter <br />connection of Orange-Alamance Water System and the Town of Mebane Water <br />System and a 12 inch meter ($10,000 at the point of interconnection with <br />the Graham Water System). <br />2. Install siphon to control downstream flow ($1,200). <br />Conservation of the water supply would be achieved at a cost of <br />$13,700 (matching funds: State $6,850, Orange-Alamance $6,850). Orange <br />Water and Sewer Authority (OWASA). <br />1. Design of booster pump. <br />2. Acquire site for pump station. <br />3. Acquire booster pump. <br />These measures would assist OWASA in transferring water to <br />Hillsborough during times of severe drought. The total cost would be <br />$219,000 (matching funds: State $109,500, OWASA $109,500). <br />Reservoir Studv <br />1. Conduct reservoir study of Seven Mile Creek and west side of '.:;~ <br />the Upper. Eno River at a cost of $60,000 (matching funds: State '' <br />$30,000, local $30,000). <br />Land Acquisition for Reservoir <br />1. Acquire land for an additional reservoir site totalling <br />$91,200 (matching funds: State $45,600, local $45,600). <br />BE IT FURTHER RESOLVED by the Orange County Board of Commissioners that <br />the Board fully recognizes Senate Bill .2 grant funds must be matched <br />with local funds at the amount of $242,450 as above indicated. <br />Cost Breakdown for Water Pro'ects <br />Lake Ben Johnston <br />1. Install extension to pump shift. $ 9,000 <br />2. Install siphon to control downstream flow. 1,200 <br />3. Modify existing trash guards at pump <br />intake. 10,800 <br />Subtotal $21,000 <br />Corporation Lake <br />1. Install six and twelve inch meters at the <br />point of the inter-connection of Orange- <br />