Orange County NC Website
2. One full size copy of an Orange County Tax map (with tax parcels involved clearly marked in <br />pencil). <br />3. Where municipal or OWASA sewer is not available, a copy of the Preliminary Plat indicating <br />Health Department soils analysis approval /denial for each lot shown thereon. <br />4. Where a private road is proposed a written statement by the applicant or his/her authorized <br />representative which sets forth the justification for a private road (see Section IV- 8-3 -d -1 of the <br />Orange County Subdivision Regulations). <br />S. Auxiliary documents, in draft form, prepared in accordance with Section'Vl. of. this Ordinance <br />which assure completion and /or maintenance of improvements required by this Ordinance. <br />Such documents may include, but not be limited to, a private road maintenance agreement, and <br />articles of incorporation and restrictive covenants pertaining to a homeowner's association. <br />These documents may be required as necessary as evidence that the ordinance requirements <br />are being met. <br />8. Fee - $350.00 plus $5.00 per lot (1 fee for preliminary and final plat). <br />7. If the subdivision contains 10 lots or more the following information shell be submitted with the <br />application: <br />a. Number of years to buildout. 5 <br />b. Number of houses to be built during each year to buildout. <br />C. Average price of houses including lots for each year to buildout. `$ O) 00 p <br />1, the applicant, hereby certify that the foregoing application is complete and accurate. <br />APPUCANT'S SIGNA OWNEWS SIGNATURE <br />m4A 5 1 Cr IOL22 <br />DATE Q DATE <br />FEES: Amount 5P. Data Paid T -/l -7 Receipt 0 / 5�2 D / J <br />r <br />✓ <br />:> r," >: <br />proposed lot lines with dimensions <br />typical street cross - sections and <br />r' <br />lot & block numbers <br />intersection details including <br />phasing lines <br />design and width of travelway and <br />topography at ten foot (10) <br />f <br />shoulders <br />{ <br />intervals <br />horizontal alignment and general <br />C <br />water bodies, streams, fioodway <br />curve data (public roads) <br />o <br />and floodplains <br />✓ <br />centerline radius on all proposed <br />stream buffers <br />�A <br />streets <br />a) <br />✓ <br />-.�-�- <br />location and size of parcels <br />``eft:' <br />permanent features such as <br />EU <br />dedicated for public use, <br />buildings, cemeteries, historic <br />Q) 4-4 <br />recreational use or reserved in <br />landmarks <br />•.i p <br />common, with purpose noted <br />V/ <br />adjoining lot layout names of <br /><`:.�«� <br />impervious surface data (if located <br />adjoining Property owners. If <br />Q) O <br />4J 44 <br />in water supply watershed) <br />subdivided, subdivision plat name, <br />� <br />% <br />,,. ,; <br />:?::e <br />vicinity map showing general <br />plat book & page number, and <br />C ti <br />location of subdivision with streets <br />(q <br />perimeter lot numbers. <br />location lots <br />o co <br />and roads identified by State road <br />,� <br />and size of of <br />U <br />•I A <br />number and name <br />restricted development potential <br />lV A <br />,,�,,,,�. <br />Vic: <br />landscaping and buffer <br />and notation on plat regarding <br />U <br />a) M <br />u co <br />NA <br />'i <br />requirements <br />township, corporate and extra - <br />I1 <br />I A <br />same <br />stormwater detention and /or <br />territorial planning jurisdiction lines <br />retention sites and undisturbed <br />which cross the property <br />areas for infiltration purposes (if <br />located in water supply <br />watershed) <br />C. <br />OTHER SUBMITTAL REQUIREMENTS <br />1. <br />Twenty-five (25) copies of the preliminary <br />plat. <br />2. One full size copy of an Orange County Tax map (with tax parcels involved clearly marked in <br />pencil). <br />3. Where municipal or OWASA sewer is not available, a copy of the Preliminary Plat indicating <br />Health Department soils analysis approval /denial for each lot shown thereon. <br />4. Where a private road is proposed a written statement by the applicant or his/her authorized <br />representative which sets forth the justification for a private road (see Section IV- 8-3 -d -1 of the <br />Orange County Subdivision Regulations). <br />S. Auxiliary documents, in draft form, prepared in accordance with Section'Vl. of. this Ordinance <br />which assure completion and /or maintenance of improvements required by this Ordinance. <br />Such documents may include, but not be limited to, a private road maintenance agreement, and <br />articles of incorporation and restrictive covenants pertaining to a homeowner's association. <br />These documents may be required as necessary as evidence that the ordinance requirements <br />are being met. <br />8. Fee - $350.00 plus $5.00 per lot (1 fee for preliminary and final plat). <br />7. If the subdivision contains 10 lots or more the following information shell be submitted with the <br />application: <br />a. Number of years to buildout. 5 <br />b. Number of houses to be built during each year to buildout. <br />C. Average price of houses including lots for each year to buildout. `$ O) 00 p <br />1, the applicant, hereby certify that the foregoing application is complete and accurate. <br />APPUCANT'S SIGNA OWNEWS SIGNATURE <br />m4A 5 1 Cr IOL22 <br />DATE Q DATE <br />FEES: Amount 5P. Data Paid T -/l -7 Receipt 0 / 5�2 D / J <br />r <br />