Browse
Search
Agenda - 06-22-1998 - 8x
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1998
>
Agenda - 06-22-1998
>
Agenda - 06-22-1998 - 8x
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2015 11:48:42 AM
Creation date
7/8/2010 12:00:53 PM
Metadata
Fields
Template:
BOCC
Date
6/22/1998
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8x
Document Relationships
Minutes - 19980622
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />Department of Transportation, within a 50 foot right -of -way and the construction <br />shall be inspected and approved by NCDOT. <br />o <br />A letter of credit, escrow agreement, or bond shall be submitted to secure <br />construction of Alex Drive, Parker's Path, Thomasview Lane and Crabtree Creek <br />Road to the standards of the North Carolina Department of Transportation. An <br />estimate of the construction cost must be prepared by a certified/licensed engineer <br />or grading contractor and submitted to the Planning and Inspections Department. <br />The financial guarantee must reflect 110% of that estimate and be issued by an <br />accredited financial institution licensed to do business in North Carolina. <br />The document describing development restrictions to be recorded with the Final <br />Plat shall state that the financial guarantee will not be released until the road <br />construction has been inspected and approved by NCDOT. <br />2. Submit an erosion control plan for construction of the roads. <br />3. A sight triangle to NCDOT standards shall be shown at all street intersections. <br />4. An approved street name sign shall be erected at the intersection of streets as <br />required in Section IV- B- 3 -c -12 of the Orange County Subdivision Regulations. <br />Evidence shall be submitted by the applicant that the sign is in place or a copy of <br />the receipt for purchase of the sign shall be submitted to the Planning Department. <br />5. All lots shall receive access from the subdivision roads. <br />6. A turnaround to NCDOT standards shall be provided at the end of Crabtree Creek <br />Road. <br />C. Land Use Buffers and Landscaping <br />1. Landscaping shall be installed or preserved as indicated on the approved <br />landscape plan, and must be inspected and approved by the Planning and <br />Inspections Department. <br />The applicant shall secure installation of required landscaping through a letter of <br />credit, escrow agreement, or bond. An estimate of the cost for required plantings <br />and their installation must be provided. The estimate for landscaping must <br />include a 10% contingency factor. The financial guarantee shall reflect 110% of <br />the estimate and be issued by an accredited financial institution licensed to do <br />business in North Carolina. <br />2. Provisions for protection of existing trees as shown on the approved landscape <br />plan shall be included in a document describing development restrictions and <br />requirements to be prepared by Planning Staff and recorded concurrently with the <br />Final Plat. <br />
The URL can be used to link to this page
Your browser does not support the video tag.