Orange County NC Website
6. Inamll a washerless faucet on the kimhw sink. <br />MECHANICAL <br />1. Insmll a propane gas pack healing and air conditioning sysmm. Make all <br />necessary mechanical connections. <br />TERMITE AND PEST CONTROL: <br />1. Pmvldealctmite end powder poll beetle irnspemion end lleelment <br />INSULATION: <br />L 1nsw11R30 insulation In the untlooreJ sections ut the awe. <br />2. Insmll R~I I insulation in all exposed inlenor framing. <br />~. Install R-19 under the Floom. <br />6. Install a 6 mil; vapor bamer. <br />TOTAL <br />