Orange County NC Website
3 <br /> FEASIBILITY OP SIMULTANEOUS OPERATION ANDIOR MAINTENANCE OF • <br /> E%ISTING LANDFILL ANO TRANSFER STATION <br /> In a memo tlateG March 12, 1998, the Solid Waste �irector provitled an overview <br /> of issues related b the tlevelopmen� antl simultaneous operotion of a trans(er <br /> s[a[ion antl �he exiating Ordnge Regional Lantlfll. A copY of�his mertro is <br /> inclutletl with ihe agenda for Ne ApM 22, 1998 LOG meeling. <br /> • <br /> • <br /> 3 PMled 08/03/98 <br />