Orange County NC Website
Potential lacations for siting a new MRF indude: <br /> • GreeneTract • <br /> • unflled area of existing lantl(II site <br /> • a[her unitlentifetl sites <br /> Implamenta[ion Item i �ate To 8e <br /> i Completetl <br /> MRF sitin decision by bcal gaveming botlies I April 1998 <br /> Selec[ion of consWtant[o assist wiN facilM development June 1998 <br /> Finalize contrzc[with consultant July 1998 <br /> Preparation antl release of RFP for MRF October 1998 <br /> Oeadline for RFPS January 1999 <br /> Review antl evaluation of ftFPS Ma¢h 1999 <br /> Selec[ion of preferretl RFP for negotiations April 1999 <br /> Sign conVact July �999 <br /> Comple�ion of facility tlesign January 2000 <br /> Begin cons[ruction March 2000 <br /> Camplete consimction June 2001 � <br /> Shaketlown ot facility and equipment July 2001 <br /> Begin full operetion Auqus� 2001 • <br /> Recommentlations <br /> In order for Ihe implementation as tlescribetl above to be accomplisheQ Ihe <br /> following decisions are requiretl: <br /> • location of MRF <br /> • ownership and operation (i.e., publiq private, or publioprivate partnership) <br /> • approval toproceetl with selection of consultant antl issuance of RFPS for ihe <br /> desiqn and developmen� of MRF <br /> The local goveming bodies shoultl make immediate tlecisians conceming each <br /> of ihe above items. <br /> • <br /> Mema. �erela0men[otMRP 2 V16198 <br />