Browse
Search
Agenda - 08-11-1998 - 1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1998
>
Agenda - 08-11-1998
>
Agenda - 08-11-1998 - 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2015 10:57:21 AM
Creation date
7/7/2010 2:05:47 PM
Metadata
Fields
Template:
BOCC
Date
8/11/1998
Meeting Type
Work Session
Document Relationships
Minutes - 19980811
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
height o f the tower is requested. As bell red by the ordinance. an ease me at for <br />the remaining setback is granted by the adjoining property owner. The reduction <br />in setback is requested to minimize the amount of property encumbered by the <br />Proposed use In a mamrer enduing the health, safety and we] l being of the <br />citizens of Orange County . <br />b) Setbacks from nomresidendal property not applicable <br />C) As depicted on the site plans submitted herewith, a Tvpe C Landscape Buffer <br />will be provided. The subject property is currently used for agricultural <br />purposes (crops), therefore there is no existing vegetation. <br />d) As depicted on the site plane, the facility is designed to accommodate at least <br />five (5) user's and equipment <br />e) The facilltywill be Fenced and looked. <br />0 The tdecommunicahon equipment planned for the proposed tower cannot be <br />accommodated on an existing tower due to allowable reason" - There are no <br />existing funnies within one (1) mile of the proposed thai lity and therefore, none <br />exist in an area where me equipment will function In its intended manner. <br />g) As stated above, the facility is designed to support several additional users. <br />Gearon Commmicaraw is willing to permit other users) to attach <br />communicated facilities which do not interfere with the primary purpose of the <br />tower, provided that such other users agree to negotiate a reasonable <br />omplensation to the owner from such liability as may result farm such <br />attachment. <br />h) The color of the tower is a light steel grog not an corrosive red and white, to <br />minimize its visual impact. <br />i) The will be lighted as required by the FAA - Lights will be white chose <br />during the day and red blinking at night. Gearon Communications utilizes Fiash <br />Technology lighting systems with advanced technology and optics that utilize a <br />namew beam spread, resulting in a red light at night Nat is no more obtnrsive <br />that a 40 wart patio light bulb. <br />J) The town and annerw will hot result in a significant adverse impact on the view <br />of or from and historic sire, scenic road, or major view condor. Please see the <br />abaveef =cell .'Tallommsd'resulu. Gearon Communications is aware of <br />the Bed and Breakfast Ism located at encatice to Morrow Mill Road. As the <br />photographs clearly Shaw, the subject facility will have no negative visual <br />impact on the Wr. The required NEPA evaluations are uMer investor, however <br />Preliminary investigations do not indicate any adverse impact (Exhibit 8). <br />it All abandoned communication records Shall he removed within 12 months of the <br />esaauan of use. Getman Communications agrees to post such band or other <br />securry ressorebly guavSeemg the removal or the rower in the eves that it is <br />abaMOned or unused for a period of 12 mantha. A ranoval sa imare provided <br />by the tower crearma company read by Gr awn Communicadoru is atuched <br />radials as Exhibit 9. <br />1) The facility will comply with all federal, stare and [mat emission requitemenrs. <br />M) Ceeron communications agree to provide documentation of emission levels in <br />rehron as FCC standards withn 30 days of Imallation of equipment on the <br />tower and widwr 30 days of the vutallalion of any collateral comments in the <br />fugue. <br />
The URL can be used to link to this page
Your browser does not support the video tag.