Browse
Search
Agenda - 08-11-1998 - 1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1998
>
Agenda - 08-11-1998
>
Agenda - 08-11-1998 - 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2015 10:57:21 AM
Creation date
7/7/2010 2:05:47 PM
Metadata
Fields
Template:
BOCC
Date
8/11/1998
Meeting Type
Work Session
Document Relationships
Minutes - 19980811
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 27 <br />GEARON COMMUNICATIONS <br />A DIVISION OF AMFRm AN TOWER SYSTirms IF P <br />Beiretrev I work v (apm n 1 <br />ID 16 XUS0oe ax 51¢ac 0u nF 201. a.LElC., N L Z760 <br />ornce. 9t9.8332301 F. 919 -0]l -2]02 <br />STATE6IE1I OF INTENT <br />German Communications, a division of American Tower Systems, LO hereby requests approval <br />If its Class A Special Use Permit application to construct, mainlein, and manage multiple user <br />fireless communication facility at the property owned by E. Carson Lloyd, Georgic M, Lloyd, <br />James Clayton Lloyd and lean C. Lloyd, located on Lloyd Town Rd., Mebane, NC (TMS <br />a2421) <br />lo¢naucum <br />Gearon Communications and American Tower Systems have merged to become the nation's <br />premler,Silly integrated name development company (collectively - ATS/Gearrn"). It combines <br />the ownership and/or management of more than 1800 woven in ] 8 states with the ability to <br />provide build -m -suit networks, professional services, and faility management services. Over <br />the past six yeas, ATS /Gearon has acquired, for carriers, more than 8,045 sites in 48 states. This <br />includes sites for virtually every wireless provider in the country. <br />EM <br />Gearon Com =lcahom' facility will be compnsed ofa 2)0 lattice s ructure enclosed within a <br />100- x 100' lease area. The facility will be fenced and locked, ammued by an emement over a <br />private road from Lloyd Town Rd. A forty foot (40') landscape buffer will be installed to screen <br />the fence and equipment cabinets. The family will be unmanned (visited on an avenge of once <br />per month for organic maintmvtce Commis), will not be lit (except as required by FAA <br />regulations), nor emit twig or glaze. <br />Gearon Communications will lease antenna space on the structure to wireless providers, u well <br />u the necessary ground space caw to accommodate their respective necessary equipment. <br />Gearon Comm kadotta will comply with such conditions the Beard ofCommissirnns is <br />emprwued w requ¢e that are deemed reasonable end necessary w afford Pmfecdon ofthc <br />public heal WEE said general Emblem agate fast zubsmndsi lludce is done and equitable <br />treatment provided <br />
The URL can be used to link to this page
Your browser does not support the video tag.