Browse
Search
Minutes - 19860106
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
1980's
>
1986
>
Minutes - 19860106
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2008 12:28:22 PM
Creation date
8/13/2008 12:46:37 PM
Metadata
Fields
Template:
BOCC
Date
1/6/1986
Document Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1bC <br /> <br />asked if a report had been made on the thoroughfare plan far Hillsborough and <br />if so if a copy could be obtained. <br />Barry Jacobs also asked how much of the 1C0 feet on each side of <br />Yanceyville Creek. is in the 100 foot buffer and Collins•explained that the <br />floodplain in .some places extends beyond the 100 foot buffer as shown and in . <br />otr~er- areas the floodplain ccmes k~ithin the 100 foot buffer. Dn an average, <br />the property takes in the 100 foot flaodplain with tre exception of the <br />southeast portion. <br />Commissioner r~arshall asked why the condition recorr~nended by the <br />Town of Hillsborough with regard to voluntary annexation was not included in <br />the conditions and Collins indicated that since the County is not involved in - <br />annexation that it was more of a municipal policy and as such the County <br />should not be involved. • <br />Comrnissianer Walker asked about the location of the Durham Loop and <br />its affects on the project. Collins indicated that the location of the loop <br />is not known at this time. <br />PRES~NTA7ION_BY THE APPLIC~INT -John McAdams, facility engineer,' <br />presented Larry Meisner, engineer with Kic:ley--corn and kss^,^lateU, Z: e. u:~o ~~ <br />t ; <br />mode a report on the traffic impact. He referred to the traffic impact <br />analysis report which is in the permanent agenda file. He noted the proposed <br />,..-.``~~ Scotswood development is served by several thoroughfares. Other future road <br />developments that may have an impact on the proposed development would include <br />the widening of 1-85 to six lanes, and x--~i0 which is currently under <br />construction. There i.s a thoroughfare program being studied for the <br />Hillsborough area and Central Grange County.. He mentioned that Highway 'j0 has <br />a 50 foot rigY,t--of-cti~ay that could be used to widen the road. The development <br />wau?d access on US 70 and 5t. tiary's Road. The fatal development would <br />generate 11,100 total trips with 5~ of this fatal traffic occuring during the <br />first phase of the project. The second phase would generate 70~ of the total <br />and the third and fourth phases would generate about 12~ each. In all cases <br />the ex~stirg volume and proposed valun~e would be under the capacity of the <br />road. Regarding the improvements that would be recuired to. accomrodate the <br />traffic, the applicant is in agreement kith those reco:rmendations outlined by <br />tdCDDT. Specifically, (1) that a traffic light be installed at the full <br />buildup of the development, (2) left and 'right turn canes at all tree project <br />er:tr-areas (3) a left turn .lane frcn- St, t•Tary's to 1~igh-aay 70 tdest, and (~1) <br />C~~rol ina AvEnue be changed to a rul-de--sac. <br />Ghair L~1i1]hait asked if First and Second fiversues were paved and <br />1-:e_kr~er irid_c~.~i.ec+ there are no access to these roads from tie development. <br />
The URL can be used to link to this page
Your browser does not support the video tag.