Browse
Search
Agenda - 09-15-1998 - 10c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1998
>
Agenda - 09-15-1998
>
Agenda - 09-15-1998 - 10c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 3:02:34 PM
Creation date
7/1/2010 3:02:29 PM
Metadata
Fields
Template:
BOCC
Date
9/15/1998
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
10c
Document Relationships
Minutes - 19980915
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Master Plan Overview <br />August 1998 <br />Page 2 <br />PROJECT APPROACH <br />Long-range master plans currently exist for some, but not all, elements of OWASA's water <br />and sewer utility. There is a growing need to supplement existing information and combine <br />all elements into a single, coherent plan that can be used to guide future water and sewer <br />investment decisions. Accordingly, OWASA desires along-range Comprehensive <br />Water/Sewer Master Plan that will integrate water and wastewater management programs <br />into a single document and guide the upgrade, expansion, and rehabilitation of OWASA's <br />infrastructure. <br />3 <br />Planning Horizon <br />The Master Plan will address both near and long-term water and sewer infrastructure <br />investments. Growth and development projections, including water and wastewater <br />forecasts, will be developed to the year 2050. Additionally, growth and development <br />projections, and associated water and wastewater forecasts, will be developed for the buildout <br />condition of OWASA's service azea. <br />Water and sewer facilities and planning-level cost estimates will be developed for each of <br />OWASA's capital facilities categories for the fifteen-year planning period extending from <br />2000 to 2015. Conceptual-level water and sewer facilities and cost estimates will be <br />developed for 2015 to 2050. <br />
The URL can be used to link to this page
Your browser does not support the video tag.