Browse
Search
Agenda - 10-20-1998 - 10b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1998
>
Agenda - 10-20-1998
>
Agenda - 10-20-1998 - 10b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2010 11:14:39 AM
Creation date
6/30/2010 11:14:36 AM
Metadata
Fields
Template:
BOCC
Date
10/20/1998
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
10b
Document Relationships
Minutes - 19981020
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br />C. Evaluation Criteria <br />The evaluation criteria below will be used in reviewing and ranking housing bond <br />fund proposals. Additional guidelines may need to be added to these in the <br />actual solicitation package depending upon the location and nature of the project. <br />Affordability (30 points) <br />The degree to which the proposed project would serve those with incomes <br />below the maximum and the period of time over which the project would <br />remain affordable to that income group. <br />a. Income targeting - 20 points <br />- If the project is designed to serve households earning less than <br />50% of the area median income, the full 20 points will be <br />awarded. <br />- If the project serves household earning less than 60% of the <br />area median income, 15 points will be awarded. <br />- If the project serves household earning less than 70% of the <br />area median income, 10 points will be awarded. <br />- If the project serves household earning less than 80% of the <br />area median income, 5 points will be awarded. <br />- (BONUS) If 100% of the units in a project serves households <br />earning less than 25% of the area median income, 5 points will <br />be awarded. <br />b. Affordability -10 points <br />- If the project is designed to remain affordable for over 40 years, <br />the full 10 points will be awarded. The period of affordability will <br />be reinforced by deed restrictions. <br />- If a project is designed to remain affordable for 31 - 40 years, <br />five points will be awarded. The period of affordability will be <br />reinforced by deed restrictions. <br />5 <br />09/24/98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.