Orange County NC Website
1. Man ory Flexible <br />Develop nt <br />Stren hs Weakne <br />• Uses existing, known • Must ensu <br />program riparian aze e ' <br />• Lower open space Protected open ace <br />may offer more design • Requires tributary <br />flexibility impoundments <br /> (watershed study) <br />• OWASAIand <br />acquisition program • Unknowns of cluster <br /> for water quality <br />a,os. roomy erd:a oov.aMa ioao9a <br />3. OWASA-Recommended <br />Stren hs Weakne <br />• Highest certainty of • Could redu <br />protection? <br />• Two development • Open space not <br />options guazanteed <br />• Fewer lots could = • If cluster option <br />reduced public service utilized,couldr~ <br />needs <br /> impoundments <br />o..o~ cwmy n.ooms n.p.m~os ~onoroe <br />Plan of A1st~on (conc> <br />• November 23 public hearing <br />• January 1999 (tent.) -Planning <br />• Feb.1999 (tent.) - Boazd of <br />a.es~ croon rVm:oa oeo.m.m in~xwga <br />2. Creative Op <br />(Cluster, Open <br />Stren hs <br />• Guarantees higher <br />open space protection <br />• Combines resource <br />protection and water <br />quality protection <br />• OWASA land <br />acquisition program <br />o.en coon w~~os wv.uom <br />Plan <br />Space Design <br />• Must ensu <br />riparian aze a in <br />protected open ace <br />• Requires tributary <br />impoundments <br />(watershed study) <br />• Unknowns of cluster <br />for water quality <br />~oaoroe <br />• Receive feedback from <br />• Hold community meeting to explain <br />discuss recommended approach <br />• Property owners notified by mail of <br />o..~s• cmmn ermune wr.eo~m ~orsase <br />2 <br />