Browse
Search
Agenda - 11-10-1998 - Attachment #2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1998
>
Agenda - 11-10-1998
>
Agenda - 11-10-1998 - Attachment #2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2013 2:17:13 PM
Creation date
6/25/2010 3:34:02 PM
Metadata
Fields
Template:
BOCC
Date
11/10/1998
Meeting Type
Schools
Document Type
Agenda
Agenda Item
Attachment #2
Document Relationships
Minutes - 19981110
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPEL HILL - CARRBORO CITY SCHOOLS <br />1998 -99 Capital Improvement Plan - Project Update <br />Proiect <br />Budget Actual Cost Proiect Status <br />Ephesus Elementary School <br />- additional student bathrooms 75,000 <br />- replace roof on origional building 354,563 <br />plus Recurring <br />Capital <br />Estes Hills Elementary School <br />- renovation 27 classrooms by <br />replaceing windows, ceilings, <br />lights, and cabinets <br />construct a 3,800 sf addition <br />containing classroom, resource <br />rooms, and adult bathrooms <br />74,501 bathrooms completed in September <br />357,056 contractor is completing final details of project <br />1,500,000 1,540,000 classroom renovations are complete <br />+40,000 two thirds of the windows have been replaced <br />1,540,000 and the remaining are scheduled for 1999 <br />building addition is being constructed and <br />scheduled to be finished in January 1999 <br />Seawell Elementary School <br />- replace thirty year old inefficient 174,747 128,105 project was completed in September <br />electric HVAC units - 40,000 <br />134,747 <br />Phillips Middle School <br />- bathroom additions and lobby 200,000 196,055 construction is complete and a certificate of <br />improvements in auditorium occupancy is expected the first week of November <br />Chapel Hill High School <br />- infrastructure improvements 1,073,603 1,073,109 project was completed in September <br />at the Cultural Arts Building <br />including replacement of stage <br />rigging, lighting, and sound <br />systems, electrical upgrades, <br />and classroom improvements <br />Lincoln Center <br />- install two mobile classrooms for 158,480 158,071 contractor is completing final activities and a <br />use by Phoenix Academy certificate of occupancy is expected in early <br />November <br />Glenwood Elementary School <br />-major renovation 1,500,000 Planning has started. Engineering studies are <br />underway. Activity is expected to begin in the <br />summer of 1999 <br />10/30/98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.