Orange County NC Website
14 <br />ARTICLE 8.2.2 - LANDFILLS (Class A Special Use) ( "Yes" indicates compliances "No" indicates Non - compliance) <br />PLANNING <br />BOARD <br />BOARD OF <br />RECOMMENDED <br />EVIDENCE SUBMITTED <br />COMMISSIONERS <br />FINDINGS <br />TO SUPPORT FINDINGS <br />FINDINGS <br />Ordinance Reauirements <br />8.8.2.1 Additional Information <br />a) <br />1) Typical cross sections showing <br />Yes <br />No <br />Landfilling is not proposed <br />Yes <br />No <br />extent of overburden, extent <br />_x_N /A <br />for this site. <br />N/A <br />of fill and water table <br />elevation, based on mean sea <br />level datum; <br />2) Proposed handling and storage <br />Yes <br />No <br />Landfilling is not proposed <br />Yes <br />No <br />areas for overburden, by- products <br />/A <br />for this site. <br />N/A <br />and fill materials; <br />_x_N <br />3) Proposed fencing, screening and <br />No <br />Screening, parking and service <br />Yes <br />No <br />gates, parking, service and other <br />_x—Yes <br />areas are indicated. <br />areas; <br />4) Any areas proposed for ponding; and <br />_x—Yes <br />No <br />There are no areas proposed <br />Yes <br />No <br />for ponding. <br />5) Access roads to the site, as well as <br />_x—Yes <br />No <br />The two access dirt roads from <br />Yes <br />No <br />on -site roads, with indication of <br />the landfill to the site are <br />surface treatment to limit dust, <br />indicated. <br />and sight distances on all roads <br />used for access to the site. <br />b) <br />1) The date of commencement of <br />No <br />The operations will begin with <br />Yes <br />No <br />operations and their expected <br />_x—Yes <br />approval of the SUP and <br />duration. <br />continue until landfill is closed. <br />2) Proposed hours and days of operation. <br />_x—Yes <br />No <br />Days and hours of operation are <br />Yes <br />No <br />indicted on the site plan. <br />3) Complete description of operation, <br />_x _Yes <br />No <br />A complete description of the <br />Yes <br />No <br />including source of materials, method <br />proposed operation has been <br />of compaction, type of sealing <br />submitted. There is no <br />proposed, types and number of <br />landfilling on the proposed site. <br />equipment to be used. <br />4) Any phasing of operations and <br />_x—Yes <br />No <br />No phasing is proposed. <br />Yes <br />No <br />relationship among phases. <br />5) A Rehabilitation Plan shall be <br />Yes <br />No <br />Landfilling is not proposed <br />Yes <br />No <br />submitted. <br />_x _N/A <br />for the site. <br />N/A <br />