Browse
Search
Agenda - 11-17-1998 - 5a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1998
>
Agenda - 11-17-1998
>
Agenda - 11-17-1998 - 5a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2010 12:11:33 PM
Creation date
6/25/2010 12:11:28 PM
Metadata
Fields
Template:
BOCC
Date
11/17/1998
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5a
Document Relationships
Minutes - 19981117
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1998
RES-1998-039 A Resolution Regarding Proposed Expansion of High Level Radioactive Waste Storage Facilies at CP &L Shearon Harris Nuclear Power Plant 11-17-1998-5a
(Linked From)
Path:
\Board of County Commissioners\Resolutions\1990-1999\1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
27 <br />Chapter Ten • Solwng the Nuclear Waste D~sposat Cns~s <br />i <br />i <br />i <br />The overheated TMI-'_ reactor core suffered partial meltdu~~'n ~~'ith rel~ca- <br />tion of approximately ~~`"but statisrically unlikelvaDespitetsubst nt ~l role se`of <br />ously considered possible <br />highh~ radioactive fission gt~sthe e ca to of all butsmininuileradiu~cti~ih to the <br />TNII-'_ containment prey en p <br />a~osphere. The tint hvo del ~ ma eeBut Plne third defense-ens epth prin~ ple <br />oo~-red that resulted in ~ ~ ~~ the <br />worked because vl nted from rea h ng the en~i onment it substanti~ ~ rnounts. <br />accident was pre e <br />The Chernobyl Accident <br />In the preda~~'n h erienced~tpe ~ ont a~cident inllconlmerc it nuclear pu~eer <br />Kiev in the Ukraine exp <br />history. The Chem lo. rea dor pb~ er. Wh en lne oper tin~sbi f dec dedit rqu cl:- <br />do~Nn capabiliri a <br />ly shutdown the reactor in r~ p he core actu ly ?n Teased pug ers r ther thlin <br />test, control rod insertion to <br />reducing pu~~'er, due trusiun generated considerable o ergyt that producted a steam <br />resulting pu••'er exCU o <br />explosion and the disassembh• of the reactor core and internals. <br />The Chernobyl core suffered ca`as~ Plmnent ~ size blle qualntihe oft lughl~• <br />the structure enclosin~ the reactor p <br />radioactive fission gases anatmosoheprern~ th serious public healtldand en 'irun- <br />proceeded directly into the p <br />mental consequences. resulted in fu 1 damage ~vitl~irtl,elulncontroldled releaee u <br />accident occurred that <br />large amounts of radiuactiyih' to the em'ironment. <br />Following the Chernobyl ace d 'el'and lire Unatede States' Congresstfhat <br />try reassured the American p P uired in American nuclear pa~~'er <br />Chernobyl lacked several desi?n features req <br />plants that made the t`' ften cited the containment sb terns loran lotted lbv feder- <br />try. These reassuran~e_ u <br />al lam' for American nuc`ear e"tuel dlmisaellThe vRCts final lon lusion t~d reel <br />if an accident results to _e e <br />f ommendations from its e~cl'~am;n ofet~en hplrno~tioFl~v 1<,Senaptured intllU CFP.. <br />for the defense-in-dept' „mented b~' continuous. a~~gresst`'e ~'en- <br />Part ~0 and its attendant reulatiuns, au, <br />fication that all three pnn~tple` tre intact. <br />4 pe th? <br />` Reiinquishing Defense-in- P <br />In No~•emhcr 1""~. the \l:C ~~'a` notified of the ~u~.luehanna ~un~er <br />~ These concerns pnmani~ im ~,~~ e the third deten`e-'n-~i~'Pth F rinciPle. ~p~'~iEi~ ~i- <br />t~? <br />
The URL can be used to link to this page
Your browser does not support the video tag.