Browse
Search
Agenda - 11-17-1998 - 5a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1998
>
Agenda - 11-17-1998
>
Agenda - 11-17-1998 - 5a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2010 12:11:33 PM
Creation date
6/25/2010 12:11:28 PM
Metadata
Fields
Template:
BOCC
Date
11/17/1998
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5a
Document Relationships
Minutes - 19981117
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1998
RES-1998-039 A Resolution Regarding Proposed Expansion of High Level Radioactive Waste Storage Facilies at CP &L Shearon Harris Nuclear Power Plant 11-17-1998-5a
(Linked From)
Path:
\Board of County Commissioners\Resolutions\1990-1999\1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Nuclear Waste Disposal Cnsrs <br />Veat Dueta <br />Dr er Drywall to RPV to Dr well <br />Y Reactor Building Bellows <br />Separator ~ Eellowa <br />Pool _ .., ~ <br />Drywall <br />~\ Draia Reactor Vessel <br />' \ .,.;.:. ;,; '.` Double <br />,:..:: . Gated RP <br />Reactor Well ~~ Fuel Pool <br />~J. <br />' ~'~% ~~``-~"`Removable <br />/ ' .Shield Plugs <br />-'i <br />Low Point Drain <br />15 <br />'Y <br />' i~ <br />Retura Diffuser ~'~ <br />:-~, <br />~ ~~~~ r: <br />~~ <br />'"" Gated . <br />- Fuel Poal <br />•Drywellt <br />RPV to Dry7wel~ <br />Bellowa Seal <br />To Leak Detection <br />Figure 8-i Reactor Well Seals <br />reactor vessel flange level within 2U minutes, flooding the containment with :-~ <br />approximately 2UU,000 gallons. [f a spent fuel assembly had been in transit at the ; <br />time, it could have been partially or completely uncovered with potentially high '` <br />radiatiun levels, fuel cladding failure and radioactivity release. In addition, if the ,a <br />fuel transfer tube had been open, the spent fuel pout could have drained to a level =.= <br />that would have uncovered the top of the irradiated fuel assemblies in the stor- '~ <br />a;e racks.'` <br />The inflatable seal on the gate to the transfer canal between the Unit 1 and i; <br />the [trait 2 spent fuel pools at the Edwin I. Hatch C`fuclear Pl<int deflated in :j <br />December 1u56 after the air supply to the seals was mistakenly isolated. Nearly y <br />111,000 gallons leaked from the spent fuel pools into the transfer canal, lowering ;~ <br />the SFP level five feet. The leak was nut identified fur several hours because a leak <br />detection instrument vas inoperable at the time. Georgia Power determined that ~~ <br />the leakage path ~uuld ha~•e drained the spent heel pool to the bottom of the <br />transfer canal, lea~•in~ only hvu feet of ~~•ater over the top of irradiated fuel <br />a~semblie~ to the ~tura~e rack>. The radiatiun field at the spent fuel pool railing <br />~~ uuld hay ~ been 11111 Rem - hr in that ~undihun, primarily from the control blades <br /> <br />r l.t <br />
The URL can be used to link to this page
Your browser does not support the video tag.