Browse
Search
Agenda - 11-23-1998 - C2 (b,c)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1998
>
Agenda - 11-23-1998
>
Agenda - 11-23-1998 - C2 (b,c)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2015 4:13:20 PM
Creation date
6/25/2010 9:36:21 AM
Metadata
Fields
Template:
BOCC
Date
11/23/1998
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C 2 (b,c)
Document Relationships
Minutes - 19981123
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n ~ ,~; <br />C. <br />the Town Engineer/LJtilities Director <br />the North Carolina Department of Health and Natural Resources <br />the North Carolina Department of Transportation <br />3. The Developer shall obtain any necessary encroachment agreements or easements <br />of use of property not owned by the undersigned developer or project owner. <br />4. All water and sewer capital facilities fees for residential projects shall be paid <br />before construction of the extension begins, subject to stipulations in Appendix A. <br />5. A Performance Bond shall be posted in favor of the Town for the total cost of the <br />water and sewer improvements, for each phase and for the off-site improvements. <br />Construction Conditions: <br />1. Unless otherwise provided in this contract, all construction shall be in accordance <br />with Town policy, standazds and specifications. <br />a) The Town shall designate the size and type of material for all water and <br />sewer lines. <br />b) All work shall be subject to inspection by the Town. No line may be <br />covered up until such inspection has taken place and if any line or facility <br />is covered up prior to inspection, the Town may require such line or <br />facility to be uncovered or exposed to view at the Developer's expense to <br />facilitate such inspection. <br />c) The Town will require any testing to determine that the work complies <br />with Town standazds and specifications. All such testing shall be at the <br />Developer's expense. <br />d) The Developer's engineers shall provide construction stakeout and <br />supervision. <br />e) An Engineer's representative shall be onsite each day that work is <br />performed and shall prepare daily logs to be submitted weekly to the <br />Town Engineer. <br />fl All construction shall be performed by a contract licenses to perform this <br />type of work in North Cazolma. <br />g) The Contractor shall have a field superintendent onsite at all times during <br />construction. <br />D. <br />2. The Developer shall beaz the total cost of all water and/or sewer construction <br />within the Project and the total cost of all water and/or sewer construction <br />required to extend service to the Project. The Town will reimburse some portion <br />of the fees 'due as participation in the cost of the extension as delineated within <br />Appendix A. <br />Post-Construction Conditions: <br />Before the Town will allow water to flow to the Project or permit use of the Town sewer <br />system to serve the Project, Developer shall: <br />
The URL can be used to link to this page
Your browser does not support the video tag.