Browse
Search
Agenda - 11-23-1998 - C2 (b,c)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1998
>
Agenda - 11-23-1998
>
Agenda - 11-23-1998 - C2 (b,c)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2015 4:13:20 PM
Creation date
6/25/2010 9:36:21 AM
Metadata
Fields
Template:
BOCC
Date
11/23/1998
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C 2 (b,c)
Document Relationships
Minutes - 19981123
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/' ~ ~ KimleyHorn <br />~:~ and Associates,lnc. <br />Memorandum <br />To: Slade McCalip <br />From: Larry Meisner ~ <br />Date: June 23, 1998 <br />o D <br />Q ,K~~ <br />Response Date: n/a <br />Subject: Lawrence Road Subdivision <br />Addendum to Traffic Impact Study <br />Based on discussions between the developer and county staff, we have made the <br />following revisions and additions to the traffic impact study. Because of the <br />minor nature of the changes, we are including the changes in this memorandum <br />rather than revising the previous document. <br />1. Additional connection to Lori Drive. As recommended by staff, an <br />additional access point at Lori Drive has been added to the site plan. The <br />connection would use existing minor roads that would provide a desirable <br />path for only a few of the trips generated by the subdivision. This access <br />point is anticipated to serve five percent of development traffic, all of <br />which would turn left onto Lawrence Road from Lannie Drive. The total <br />traffic served by the new access point is estimated to be 120 trips per day, <br />including nine trips during the AM peak hour (two in, seven out), and 12 <br />trips during the PM peak hour (eight in, four out). All of these trips would <br />be subtracted from the right turns into the subdivision on Lawrence Road, <br />and the corresponding left turn out. There would be no change is the <br />projected level of service (A) of that intersection, which would operate with <br />minimal delays. Because of the low volumes at the new access point, no <br />road improvements are recommended beyond the connection. <br />2. Left-turn lane on Lawrence Road. Based on discussion at the Planning <br />Board meeting and with staff, the developer has agreed to install alert-turn <br />lane into the site on Lawrence Road. The turn lane will be under contract at <br />the time grading begins on-site, and completed prior to issuance often <br />percent of the building permits for the subdivision. <br />^ <br />r~ 9~8 sn 2000 <br />fAX 919 677 2050 <br />J I ~ <br />^ <br />P.O. Box 33068 <br />Raleigh, Nosh Carolina <br />21636.3068 <br />
The URL can be used to link to this page
Your browser does not support the video tag.