Orange County NC Website
I. <br />B. STATE PER2~SIT5 REQUIRED <br />1. Does the project involve the mining o~ earth products? <br />No <br />i <br />• <br />If - so, how many cubic feet of material are expected to be <br />• excavated? <br />Has an application for a Mining Permit been submitted to <br />• NCDRCD? <br />Please attach map indicating expected extent of proposed <br />activity. <br />2. Does the project involve generation or storage of <br />hazardous or toxic wastes, as identified by the <br />Environmental Protection Agency? (A listing of all <br />hazardous materials is available from the Planning <br />Department) No <br />Describe the wastes to be generated. 4 <br />how much material is expected to be generated per month? <br />- ~ Will any material be treated onsite? <br />- Volume? <br />Will any ;sate=ial be stored onsite? <br />- Volume? <br />• ... <br />-- .._----- where will--disposal of the irate.izl ta~:e place? <br />How will materiels be traIISDO=..ed to the cisposa? site? <br />.. What measures are proposed to p:otec;. wa~e:csality and <br />air qua? ity is case of sp; lls? <br />