Browse
Search
Agenda - 11-23-1998 - C2 (b,c)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1998
>
Agenda - 11-23-1998
>
Agenda - 11-23-1998 - C2 (b,c)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2015 4:13:20 PM
Creation date
6/25/2010 9:36:21 AM
Metadata
Fields
Template:
BOCC
Date
11/23/1998
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C 2 (b,c)
Document Relationships
Minutes - 19981123
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I>> <br />because there are some parcels in that azea that could benefit from better <br />access. He continued that they did not feel it would be good to stubout to <br />the south since it is an established residential azea and also a very low area <br />where a retention pond is proposed. He felt a stubout to the east is more <br />appropriate, particulazly since utilities will be extended to the east. <br />Mr. Murray noted that one of the requesu or recommendations was for a <br />transit stop. He indicated there were several azeas that could accommodate <br />that request. He continued that the request fora 75-foot buffer and <br />plantings between the ballfields and the properties could also be easily <br />accommodated. Mr. Murray spoke to the concern regazding the mountain <br />laurel. He stated that efforts will be made to preserve that in the recreation <br />area and they would support a relocation program for the mountain laurel <br />that falls into roadways and lots. While he was not sure that mountain <br />laurel would survive relocation, he indicated he would seek assistance from <br />the Botanical Gazdens in Chapel Hill to aid in this project. Efforts will be <br />made to use the mountain laurel plants on site. <br />In regard to the concern with parking, he indicated the developer would like <br />to see less parking and residents walking to the park. However, they could <br />do it either way and address staff s concern. <br />In regard to soil limitations, he agreed with the information provided but <br />noted that this is an issue that can be overcome with a little more cost to the <br />developer for construction. <br />Katz expressed concern with the need for access for the back lots to the <br />park. Mr. Murray responded that a sidewalk could be constructed to go <br />around the lots to the park. Katz continued asking if the developer would <br />consider reserving some lots for houses in a lower price range. Mr. Murray <br />responded that he would relay this concern to the developer agreeing that it <br />would make homes available to more people. <br />Barrows asked if the developer would bear the cost of relocating the <br />mountain laurel plants and the response was they would be willing to do <br />what would be considered reasonable to help take care of the relocation. <br />Andrews asked about the time frame to buildout. Mr. Murray responded <br />that the development is scheduled to be completed in five phases. Probably <br />a year of development for each phase and seven to eight years for complete <br />development. <br />Seazles asked about the response to the concern of turn lanes on Lawrence <br />Road. Lang Meisner of Kimley-Horn Associates responded to this <br />concern. He stated that four different intersections were reviewed for the <br />study: Lawrence Road and 70 Business, 70 Business and 70 Bypass to the <br />east, Lawrence Road and Old NC 10 and Old NC 10 and NC 86. All of the <br />intersections are operating at acceptable or good levels of service during <br />peak hours except for Old NC 10 and NC 86. There is a lengthy delay <br />turning from Old NC 10 onto NC 86. <br />Mr. Meisner noted that The Institute of Transportation Engineers figures for <br />daily and peak hours were used to determine the impact of this subdivision <br />on the roads and the result was that all of the intersections with the <br />
The URL can be used to link to this page
Your browser does not support the video tag.