Orange County NC Website
l;~r~ <br />L <br />ARTICLE 4 -DISTRICT STATEMENTS OF INTEREST AND APPLI ATION CRITERIA ("Y " indi atac rmm~t~anrc No <br />sdtcates non-compliance) <br /> PLANNING PLANNING <br /> STAFF EVIDENCE SUBMITTED BOARD <br /> FINDINGS TO SUPPORT FINDIN ~G FINDINGS <br />Ordinance Reg~irements <br />Article 4.2 identifies the criteria <br />which will normally be used to <br />determine the application of a <br />zoning district designation, The <br />applicant has applied for a <br />R <br />2 Low I <br />t <br />i <br />R <br />id <br />- <br />n <br />ens <br />ty <br />es <br />ential <br />designation. The criteria for the <br />R-2 district are set forth in <br />Article 4.2.4 and are as follows: <br />(a) Intent <br />The purpose of the low and medium <br />Intensity Residential (R-2, R-3, R-4) <br />Districts is to provide locations for <br />low and moderate intensity residential <br />development and supporting recreational, <br />community service and educational uses <br />in areas where urban services are <br />available or are to be provided as part <br />of the development process. <br />(b) Application Criteria <br />This district will usually be applied where <br />the following conditions exist: <br />1) Designated by the adopted _x_Yes No The property is designated Yes No <br />Comprehensive Plan as a as 20 year transition on the <br />Transition Area, which can Orange County Comprehensive <br />reasonably be expected to be Plan. <br />annexed by a municipality in <br />the ensuing 10-20 years. <br />2. Water and sewer lines should _x_Yes No Water lines exist at the site. Yes No <br />exist at the site or be assured Sewer lines are proposed to be <br />of installation as part of the extended to the site from the <br />development process. Meadowlands development. <br />3. Vehicular access must consist of _x_Yes No US 70A and Lawrence Road Yes No <br />direct access to a street classified are designated as collectors <br />as either arterial or collector as in the Comprehensive <br />designated by the adopted Plan. <br />Comprehensive Plan. <br />