Browse
Search
Agenda - 11-23-1998 - C2 (b,c)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1998
>
Agenda - 11-23-1998
>
Agenda - 11-23-1998 - C2 (b,c)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2015 4:13:20 PM
Creation date
6/25/2010 9:36:21 AM
Metadata
Fields
Template:
BOCC
Date
11/23/1998
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C 2 (b,c)
Document Relationships
Minutes - 19981123
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~2 <br />Orange County Board of Commissioners <br />September 28, 1998 <br />Page 6 <br />In Phase II, an active recreation playfield sized for soccer and softball will be <br />developed as well as a centrally located pazk. Although only 120 of the 237 <br />lots will be developed during Phases I & II, all recreation facilities will be de- <br />veloped during these phases. <br />The playfield will be in an area of the site that is currently a fallow farmed <br />field and well suited for active recreation. <br />The park will contain benches and seating areas, a tot lot, playground area, and <br />open areas usable for games such as volleyball, badminton, shuffleboazd, and <br />bocce. The park is in an area that is currently forested thereby allowing for <br />the retention of existing trees throughout the pazk as well as the retention of a <br />significant tree border where the park will adjoin proposed home sites. <br />All four of the recreation areas will be fully accessible by pedestrians and bi- <br />cyclists. At the playfield and pazk, pazking is provided for automobiles. <br />3) Although the subject site is not located in a protected watershed, stormwater <br />management and stormwater quality facilities aze a part of the development <br />application. <br />Calculations for the proposed development show that about 24.5% of the site <br />will be covered by impervious surfaces. Conversely, slightly over 75% of the <br />site will be pervious in the form of unpaved playfields, lawns, planted azeas, <br />and undisturbed buffer areas. <br />Stormwater detention facilities owned and maintained by the homeowners as- <br />sociation will be provided in two locations. Each of these is at the naturally <br />occurring low spots on the site along the channels of existing intermittent <br />streams. The lazger of the two facilities, 1.4 acres in azea, is along the north- <br />ern edge of the site and is proposed to be a wet pond for the purpose of water <br />quality control for the majority of stormwater runoff that will leave the site. <br />The stormwater detention system is designed to meet the County standazd that <br />stormwater from a 25 yeaz storm event leaving the site after development will <br />not exceed the stormwater from a 25 yeaz storm leaving the site in its current <br />undeveloped condition. <br />
The URL can be used to link to this page
Your browser does not support the video tag.