Browse
Search
2009-109 Aging - Application for American Recovery and Reinvestment Act Transit Funds
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2009
>
2009-109 Aging - Application for American Recovery and Reinvestment Act Transit Funds
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2012 3:58:15 PM
Creation date
6/24/2010 3:35:13 PM
Metadata
Fields
Template:
BOCC
Date
5/5/2009
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
5a
Document Relationships
Agenda - 05-05-2009 - 5a
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2009\Agenda - 05-05-2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• The Recovery.Gov logo should be larger than the TIGER logo. <br />• Because the TIGER logo was designed to identify US DOT ARRA projects, it is <br />not necessary to display the standard DOT triscalion seal in combination with the <br />TIGER logo. <br />• It is not necessary to display the standard FTA mark in combination with the <br />TIGER logo. <br />• Grantees may adapt placement of the logos and may design signs to be suitable <br />to the specific project on which they are displayed, but may not alter the design <br />and colors of the logos themselves. <br />• Signs at construction projects, for example facilities, should be placed where they <br />are visible to passersby and to customers approaching the site. <br />• Revenue service vehicles may be identified by a decal and/or bumper sticker <br />visible to the public and to boarding passengers. <br />• FTA understands that the useful life of a bumper sticker or decal may be less than <br />the useful life of the vehicle to which it is attached, while a costly new facility <br />funded by ARRA might merit a more durable permanent sign. <br />If a construction project involves roadways, grantees should use the guidance for <br />road signs disseminated by the FHWA division offices. <br />• Safety concerns should be taken into consideration in the placement of signs, so <br />as not to obscure traffic control signs, for example, or create a hazard. <br />• Grantees may use the Recovery.Gov and TIGER logos on paper documents and <br />websites related to ARRA funded projects, for example bid documents and <br />website postings of contract awards. <br />Section 7. Posting with the Local Employment Security Commission <br />a. Posting Requirements. The Subrecipient agrees that all Contractors and <br />subcontractors hired will be required to agree that in addition to any other job postings the <br />Contractor (ESC) normally utilizes, the Contractor shall post with the local Employment <br />Security Commission Office all positions for which he intends to hire workers as a result of <br />being awarded this ARRA contract. Labor and semi-skilled positions must be posted for at <br />least 48 hours before the hiring decision. All other positions must be posted a minimum <br />posting of five days before the hiring decision. The Contractor and any Subcontractor <br />shall report the new hires in the manner prescribed by the Employment Security <br />Commission and the OERI. The NC ESC Homepage can be found at www.ncesc.com. <br />Section 8: Contractor Capacity Responsibility <br />a. Contractors Primary Responsibility to Comply with Federal and State Reauirements. <br />Irrespective of involvement by any other participant in the Project, the Contractor agrees <br />that it, rather than the participant, is ultimately responsible for compliance with all <br />applicable Federal and State laws, regulations, and directives, the Master Agreement <br />between the FTA and the Department, and this Agreement, except to the extent that the <br />Department determines otherwise in writing. Unless otherwise authorized in writing by the <br />Department, the Contractor shall not assign any portion of the. work to be performed under <br />this Agreement, or execute any contract, amendment, or change order thereto, or obligate <br />itself in any manner with any third party with respect to its rights and responsibilities under <br />this Agreement without the prior written concurrence of the Department. Further, the <br />Contractor shall incorporate the provisions of this Agreement into any lease arrangement <br />and shall not enter into any lease arrangement without the prior concurrence of the <br />Department. Any lease approved by the Department shall be subject to the conditions or <br />limitations governing the lease as set forth by the FTA and the Department. If the Grantee <br />leases any Project asset to another party, the grantee agrees to retain ownership of the <br />Revised 1/6/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.