Orange County NC Website
a~ <br />Exhibit F <br />Construction Cost Detail <br />Area "C" -Glen Ridge Town Home Association, Inc. property segment of sewer facilities <br />Total of itemized construction elements $156,732 <br />Pro rata share of mobilization/demobilization 5,000 <br />Total <br />$161,732 <br />Included in the Total aze allowances for 250 cubic yards of rock removal at a price of $35.00 per <br />cubic yard and 250 cubic yards of unsuitable soil removal and replacement at a cost of $25.00 <br />per cubic yazd. The cost to be shazed by M/I, Priority and the County shall be increased or <br />decreased to the extent that the rock and the unsuitable soils quantity allowances are exceeded or <br />not reached. <br />Area "B" - M/I property segment of sewer facilities <br />Total of itemized construction elements $ 56,159 <br />Pro rata shaze of mobilization/demobilization 2,040 <br />Total <br />$ 58,199 <br />Included in the Total are allowances for 100 cubic yazds of rock removal at a price of $35.00 per <br />cubic yazd and 100 cubic yazds of unsuitable soil removal and replacement at a cost of $25.00 <br />per cubic yazd. The cost to be shazed by M/I, Priority and the County shall be increased or <br />decreased to the extent that the rock and the unsuitable soils- quantity allowances are exceeded or <br />not reached. <br />10 <br />