Browse
Search
NS - Sanitary Sewer Easement on Elementary School #10 Site and Proposed Cost-Share Agreement
OrangeCountyNC
>
Board of County Commissioners
>
Various Documents
>
2000 - 2009
>
2007
>
NS - Sanitary Sewer Easement on Elementary School #10 Site and Proposed Cost-Share Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2011 4:13:04 PM
Creation date
6/24/2010 11:11:31 AM
Metadata
Fields
Template:
BOCC
Date
12/11/2007
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
4s
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
is <br />b. M/I and the County will shaze equally the total cost of the construction of <br />the sewer facilities across the M/I property, Area "B" on Exhibit F hereto, which total cost is <br />particularly detailed on Exhibit F hereto. <br />6. M/I and Priority each shall pay its portion of the total costs of the sewer facilities <br />construction project as detailed in pazagraph 5 of this Agreement in one lump sum payment <br />within thirty (30) business days after receipt of written demand for payment from the County, <br />which demand shall be accompanied by (i) a complete copy of the as-built drawings of the sewer <br />facilities, (ii) an itemized statement of the actual costs of construction of the sewer facilities, <br />certified by the project engineer and (iii) written evidence of acceptance of the sewer facilities by <br />the Orange Water and Sewer Authority. <br />7. The County agrees, through its agent the Chapel Hill-Carrboro City Boazd of <br />Education, to construct the sewer facilities in accordance with the completed plans and <br />specifications approved by OWASA and all other applicable governmental entities under the <br />standazds and requirements of OWASA, and shall cause OWASA to accept the sewer facilities <br />for operation and maintenance as part of the OWASA sewer system, including resolving all <br />sewer system repairs, warranty claims or any other OWASA requirement necessary to <br />accomplish OWASA acceptance of the sewer facilities at the conclusion of the sewer facility <br />construction warranty period. <br />8. In the event County does not commence construction of the sewer facilities <br />construction project at its "downstream" end (at the point where it connects to an existing <br />Orange Water and Sewer Authority sewer facility at or neaz the eastern boundary of the <br />Glenridge Townhome Association property) on or before January 15, 2008, any party to this <br />Agreement may, in its sole and absolute discretion, terminate this Agreement by providing notice <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.