Browse
Search
S Purchasing - Construction Manager at Risk Services for Emergency Services Facility
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
S Purchasing - Construction Manager at Risk Services for Emergency Services Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2012 11:55:35 AM
Creation date
6/23/2010 12:32:18 PM
Metadata
Fields
Template:
BOCC
Date
12/11/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4l
Document Relationships
Agenda - 12-11-2007-4l
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 12-11-2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
shown at that time to be incomplete or defective. Within thirty {30} days of receipt of any <br />deficiency list, the Contractor shall complete and correct all items on that fist along with alt <br />other Work required to achieve Final Completion of the Work. At any time prior to <br />completion of the period of warranty, the CMAR may submit to the Contractor supplemental <br />deficiency lists, in which case the Contractor shaft complete or correct any and all new <br />items identified on the supplemental deficiency fists within the time period stipulated in <br />paragraph 18.3 of these General Conditions. <br />21.3 The making and acceptance of Final Payment shalt constitute a waiver of ail claims by the <br />CMAR except: <br />a} Claims arising from unsettled liens or claims against the Contractor. <br />b} Defective Work or materials appearing after Final Payment. <br />c} Failure of the Contractor to perform the Work in accordance w'sth the Contract <br />Documents. <br />d} As conditioned in the Performance Bond. <br />e} Claims made prior to Final Payment which remain unsettled. <br />f} Amounts due arising under Articles 18 and 28 of these General Conditions. <br />g} Claims for recovery of overpayment based upon incorrect measurement, estimate, <br />or certificate. <br />21.4 The making and acceptance of Final Payment shall constitute a waiver of all claims by the <br />Contractor except those claims previously made in writing pursuant to paragraph 15.2 of <br />these Genera{ Conditions and not finally resolved. <br />Z1.5 The CMAR shall not be required to make Final Payment unless and until {i} the Designer <br />has certified based on the Designer's observations and information that all of the Work by <br />the Contractor under the Contract Documents has been completed in accordance with the <br />Contract Documents, and (ii) the Work by the Contractor has been approved by al[ federal, <br />state and Local agencies having Jurisdiction. <br />21.6 ~ The final Request for Payment shall be identified on its face as such and shalt be <br />presented by the Contractor to the CMAR within thirty {30) days of completion of the Work. <br />Final payment of the retained amount due the Contractor. shad be made by the CMAR <br />within thirty (3©) days after the later of (i) full and Final Completion of all Work required of <br />the Contractor by the Contract Documents, and certification of such Work in accordance <br />with paragraph 21.5, {ii} submission of the affidavits and other documentation required by <br />Article 22; (fit} submission by the Contractor of a Request for Payment identified on its face <br />as final. <br />ARTICLE 22. CONTRACTOR, SUBCONTRACTOR AND SLIPPLtER AFFIDAVIT <br />22.1 The Final Payment due the Contractor on account of the Contract Documents shalt not <br />become due until the Contractor has furnished to the CMAR: (A) an affidavit by the <br />Contractor signed, sworn, and notarized to the effect that ati payments for materials, <br />services,- or for any other reason in connection with the Work or performance of the <br />Contract Documents have been satisfied and that no claims or liens exist against the <br />Contractor in connection with the same; (8} affidavits from each Subcontractor and supplier <br />signed, sworn, and notarized to the effect that {i} each such Subcontractor or supplier has <br />been paid in Tuft by the Contractor for all Work performed andlor materials supplied by it in <br />GENERAL CONDITIONS FOR CM AT RISK PROJ7=CT 37 of 42 JUNE 2007 ED1TlCiV <br />