Browse
Search
S Purchasing - Construction Manager at Risk Services for Emergency Services Facility
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
S Purchasing - Construction Manager at Risk Services for Emergency Services Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2012 11:55:35 AM
Creation date
6/23/2010 12:32:18 PM
Metadata
Fields
Template:
BOCC
Date
12/11/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4l
Document Relationships
Agenda - 12-11-2007-4l
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 12-11-2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
whereupon the Contractor shall so proceed and keep accurately, in such form as may <br />be required by the CMAR, a correct account of costs together with. all-proper invoices, <br />payrolls, and supporting data therefore. <br />15.4 Where the Contract Price is to be adjusted, the following limitations shalt apply in <br />determining the amount of adjustment: <br />(a} In the ease of extra or emergency work, the Contract Price shall not be Increased by <br />more than the reasonable, actual, and documented net cost of the extra or emergency <br />work plus ken percent (10%) of such net cost on Work performed by the Contractor and <br />five percent {5%} thereof on any subcontracted Work for overhead and profit combined. <br />(b) In the case of a decrease in Work, the Contract Price shat! not be decreased by less <br />than the'net cost of the deleted Work.pius five percent (5%) of such direct net cost for <br />profit and overhead. <br />The term 'net cost' as used herein shall include, as applicable, and shall be limited to, alt <br />direct labor, direct material, direct equipment, tabor burden, safes taxes, shipping .and <br />handling charges, permits and fees, and insurance and bond premium adjustments, if any, <br />attributable to the change. Alt other items of cost shall be considered as overhead and <br />covered by the percentages allowed in sections (a} and {b} of this paragraph. <br />The Contractor shall provide worksheets or tabulations describing the method by which the <br />direct net cost was calculated, and shall provide alt data needed to support the calculation <br />of the direct net cost, alt in a form acceptable to the CMAR. <br />ARTICLE 1ti. UNFORESEEN CONDIT[ONS <br />16.1 Should the Contractor encounter unforeseen conditions at the Project. site materially <br />differing from those shown on the Drawings or indicated in the Specifications or differing <br />materially from those ordinarily encountered and generally recognized as inherent in work <br />of the character provided #or in this Agreement, the Contractor shalt immediately, and in no <br />event more than three {3} days later, give notice to the CMAR of such conditions before <br />they are disturbed. The CMAR shalE thereupon promptly notify the Destgner and Owner <br />and investigate the conditions. The CMAR shalt as soon as practicable request that the <br />Designer make such changes in the Drawings and/or Specifscations as the CMAR and the <br />Contractor believe are necessary to continue the Work. Any increase or decrease in the <br />Contract Price resulting from such changes shall be adjusted in the manner provided <br />herein for ad}'ustments as to extra and/or additional Work and changes. The CMAR shall <br />not be liable or responsible for additional work, costs, or changes to the Work that could <br />have been reasonably determined from any reports, surveys, and analyses made available <br />for the Contractor`s review or that could have been discovered by the Contractor through <br />the performance of its obligations pursuant to the Contract Documents. <br />ARTICLE 17. CORRECTIQN OF WORK BEFORE FINAL PAYMENT <br />17.1 The Owner and the CMAR have the authority to stop or suspend Work and to order Work <br />removed ar to order corrections of defective Work or Work not in compliance with the <br />Contract Documents where such action may be necessary to ensure successful completion <br />of the Work. <br />Any work, materials, fabricated items;. or other parts of the Work which have been found by <br />the CMAR, the Owner or the Designer to be .defective or not in accordance with the <br />Contract Documents shall be condemned and shall be removed from the Project by the <br />Contractor, and immediately replaced by new Work in accordance with the Contract <br />GENERAL CONDITIONS FOR CM AT RISK PROJECT 32 of 42 JUNE 2007 EDITION <br />
The URL can be used to link to this page
Your browser does not support the video tag.