Browse
Search
S Purchasing - Construction Manager at Risk Services for Emergency Services Facility
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
S Purchasing - Construction Manager at Risk Services for Emergency Services Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2012 11:55:35 AM
Creation date
6/23/2010 12:32:18 PM
Metadata
Fields
Template:
BOCC
Date
12/11/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4l
Document Relationships
Agenda - 12-11-2007-4l
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 12-11-2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
obligations assigned to or undertaken by the Contractor shall be at its expense without <br />change in the Contract Price. The Contract Price may only be changed by a Change Order. <br />15.2 Any claim for an adjustment in the Contract Price shall be in writing. Written notice of any <br />event, action, or r#on-action which may become the basis of a claim shall be delivered to <br />the CMAR within fhree (3) days of the occurrence, or the beginning of the occurrence, of <br />any such event, action or non-action giving rise to the claim. Such written notice is a <br />condition precedent to the making of a claim, and such notice shall describe the basis of <br />the poten#ial claim with reasonable detail and clarity. <br />A claim shalt be made in writing and shall be delivered to the CMAR no later than fourteen <br />(14} days after such notice. The claim shall describe in detail the basis for the claim, with <br />specific reference to any provisions of the Contract Documents, by paragraph, drawing <br />number, or other specific Identification, and shalt skate the amount claimed and how it is <br />calculated. If the Contractor, at the time the claim is made, is unable to state the amount <br />claimed with accuracy, the Contractor shall so state and provide the estimated amount and <br />the basis on which the amount is to be calculated. At the earliest date practicable, but in no <br />event more than thirty (30) days after Contractor's. notice of claim, the Contractor shall <br />supplement the claim with an accurate statement of the amount claimed and how it has <br />been calculated. The Contractor shall provide, in writing, in support of the claim alt such <br />explanations, arguments, data, receipts, expert opinions, or other documents or information <br />as the Contractor deems appropriate to be considered in support of the claim. A claim may <br />properly be rejected by the CMAR by reason of the Contractor's failure to submit adequate <br />or accurate documentation or information, except that within seven (7} days after being <br />given notice that the claim has been rejected on this basis, the Contractor may submit <br />additional documentation or information. No claim for a change of the Contract Price shall <br />be considered or granted (except solely at the discretion of the CMAR) unless a claim is so <br />made, nor shall the Contractor be entitled to any increase in the Contract Price unless the <br />Contractor has given notice and made such a written claim within the times required. The <br />CMAR shall decide, after obtaining the advice of the Owner and the Designer, whether an <br />. increase in Contract Price is warranted, and the amount of such increase shall be <br />determined as provided in paragraphs 15.3 through 15.4, below. Any change in the <br />Contract Price resulting from any such claim shall be incorporated in a Change Order. <br />The CMAR shall advise the Contractor of its decision with respect to the claim within thirty <br />(30j days of its receipt, or of the receipt of additional documentation or Information if the <br />absence of such has previously been the basis of rejection of the claim. Any claim on which <br />the CMAR has not provided its decision to the Contractor within the applicable time period <br />shaii be deemed denied. <br />If the Contractor is not satisfied with the decision of the CMAR, the Contractor may within <br />seven (7) days of receipt of the CMAR's decision initiate the mediation process as <br />described in Appendix A to these General Gonditions. <br />15.3 In determining the amount of a Contract Price adjustment, the parties shaii .apply the <br />following methods, as appropriate; <br />(a} Change in Work: The CMAR and the Contractor shall negotiate in goad faith and <br />attempt to agree upon the value of any change (extra or decrease) in Work prior to the <br />issuance of a Change Order covering said Work. Such Change Order shaft set forth <br />the corresponding adjustment to the Contract Price. !n the event the CMAR and the <br />Contractor are unable to agree, the CMAR shalt grant an equitable adjustment in the <br />Contract Price. <br />(b} Emergency Work: In the event of emergency endangering Ide or property, the <br />Contractor may be directed by the CMAR to proceed on a time and material basis, <br />GENERAL CONDITIONS FOR CM AT RISK PROJECT 31 of 42 JUNE 2007 EDITION <br />