S Purchasing - Construction Manager at Risk Services for Emergency Services Facility
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
S Purchasing - Construction Manager at Risk Services for Emergency Services Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2012 11:55:35 AM
Creation date
6/23/2010 12:32:18 PM
Metadata
Fields
Template:
BOCC
Date
12/11/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4l
Document Relationships
Agenda - 12-11-2007-4l
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 12-11-2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14.5 Increases in the Contract Price and/or extensions of the Contract T"sme for additional Work <br />performed by the Contractor shall only be In accordance with a written Change Order or <br />Construction Change Directive signed by the CMAR. The Contractor shall not be en#itted <br />to additional time or to additional compensation for any Work performed or material <br />supplied which is claimed to have been authorized or settted by an "oral° change, or by a <br />"constructive" or "implied"change, or by a course of conduct, or by any action ornon-action <br />by the CMAR, or any other persons, or by any means whatsoever other than by a written <br />Change Order or Construction Change Directive for such Work or material signed by the <br />CMAR. <br />14.6 Changes in the Work resulting from emergency shall not invalidate the Contract Documents <br />nor release the surety if the Contractor is bonded. <br />14.7 The CMAR shall nat be responsible for verbal instructions which have not been confirmed <br />in writing, and in no case shall such instructions be interpreted as permitting a departure <br />from the Contract Documents unless such instruction is confirmed in writing and supported <br />by a proper Change Order, Construction Change Directive or Field Order, whether or not <br />the cost is affected. <br />14.8 if the Contractor is bonded, the CMAR, in its sole discretion, may require that the <br />Contractor notify the Contractor's sureties of any changes affecting the general .scope of <br />the Work ar change in the Contract Price, and that the amount of applicable bonds shall be <br />- adjusted accordingly. if this requirement is exercised, the Contractor shall furnish proof of <br />such adjustment to the CMAR. <br />Ef this requirement is exercised, the Change Orders and Construction Change Directives <br />sha{I require written consent of the Contractor's surety. At the time of s'sgning a Change <br />__ Order, the Contractor shat! be required to certify as follows: <br />"i certify that all sureties have been notified that my contract has been altered by <br />the amount of this Change Order or Construction Change Directive and that a copy <br />of the approved Change Order or Construction Change Directive will be mailed to <br />alt sureties upon its receipt by me." <br />if this requirement is exercised, no payment to the Contractor on account of any Change <br />Order or Construction Change Directive shalt become due or payable until written evidence <br />of the surety`s consent to the Change Order or Construction Change Directive has been <br />furnished to the CMAR, and the furnishing of such written consent is a condition precedent <br />to such payment. <br />14.9 The Contractor shaft support ail requests for Change Orders with a detailed cost <br />breakdown showing cost of materials, tabor, equipment, transportation, other items, <br />Contractor's overhead and profit, and total cost, in accordance with methods defined in this <br />Article, and, if the request seeks an extension of the Contract Time, with atime-related <br />diagram which demonstrates specifically why an increase in construction time is needed. <br />14.10 When a request for a Change Order involves a Subcontractor, the Contractor shall provide <br />quotation from same on Subcontractor`s letterhead. The Subcontractor's quote shat[ list <br />materials, equipment, and tabor separately, and show overhead and profit in the manner <br />provided in paragraph 14.9. <br />ARTICLE 15. CHANGE OF THE CONTRACT PRICE <br />i5.1 The Contract Price constitutes the total compensation payable to the Contractor for <br />performing atl Work under the Contract Documents. All duties, responsibilities, and <br />GENERAL CONDITIONS FOR CM AT RISK PROJECT 3t) of 42 JUNE 2007 EDITION <br />