Browse
Search
S Purchasing - Construction Manager at Risk Services for Emergency Services Facility
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
S Purchasing - Construction Manager at Risk Services for Emergency Services Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2012 11:55:35 AM
Creation date
6/23/2010 12:32:18 PM
Metadata
Fields
Template:
BOCC
Date
12/11/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4l
Document Relationships
Agenda - 12-11-2007-4l
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 12-11-2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
designated to remain in the vicintfy of the operations and barricade alt walks, roads, and <br />areas as necessary to keep the public away from the construction. <br />7.17 The Contractor shop provide cover and/or protect all portions of the Work and provide all <br />materials necessary to protect the Work whether performed by the Contractor or any of the <br />Subcontractors or sub-subcontractors. Any Work damaged #hraugh the {ack of proper <br />protection, or #rom any other cause, shaft be repaired or replaced without extra cost to the <br />CMAR or extension to the Contract Time. <br />The Contractor shall Taintain the Work during construction and until the Work is accepted. <br />This maintenance shall constitute continuous and effective effort prosecuted day by day, <br />with adequate equipment and forces so that the Work is maintained in satisfactory <br />condition at all times. A!I costs of maintenance shall be included in the Contract Price and <br />the Contractor will not be paid an additional amount for such effort. Should the CMAR <br />observe that fhe Contractor at any time has failed to maintain the Work as provided herein, <br />the CMAR may immediately notify the Contractor of such non-compliance. Such notification <br />shall specify a reasonable time within which fhe Contractor shall be required to remedy <br />such unsatisfactory maintenance condition. Should the Contractor fail to properly respond <br />to the ~ CMAR's notification, the CMAR may, at the Contractor's expense, take such action <br />as it may deem appropriate to remedy the defective maintenance, including suspension of <br />the Contractor's Work or any part thereof. Any such expense incurred by the CMAR shall <br />be deducted from monies due or to became due the Contractor. <br />Parking lots, streets, and walks connecting to the Project area shall 'at all times be <br />protected by the Contractor from depos'sts of mud, sand, stone, fitter, or debris in any form. <br />Pedestrian traffic areas around the construction limits must be maintained in a clean and <br />safe condition at a[l times with required barricades and covered walkways. When <br />excavation or other operations outside the Project limits is required, the Contractor shall, <br />immediately following that work, return the area to its original condition. <br />Ali catch basins and storm drain lines in the vicinity of the Project site shall be protected at <br />alt times from entry of dirt, rubble and other debris. The residue from fhe cleaning of trucks, <br />wheelbarrows, concrete buggies, etc. must be prevented from entering-fhe- drainage <br />syskern, and if cleaning is done, the residue must be contained and removed from fhe <br />Project site with other refuse. <br />7.18 No burning of refuse or debris shall be allowed inside or around the Project during the <br />course of construction. <br />7.19 The Contractor shalt provide for and maintain necessary safety measures and safety <br />programs for the protection of its employees and other persons at the Project site, and shalt <br />comply at alt times with the requirements of the most current edition of the CAGC Safety <br />and Health Manual [ar the AGG Accident Prevention Manual in Constructionj, or the <br />equivalent requirements of the Contractor's safety program, and shaft fully comply with afE <br />Federal, State, and focal laws, rules, regulations, and building code requirements so as to <br />prevent accidents or injuries to persons on or about the Project site. The Contractor shall <br />clearly mark or post signs warning of existing hazards, and shall barricade excavations, <br />elevator shafts, stairways, floor and wall openings and similar hazards. The Contractor <br />shall protect against damage or injury resulting from falling materials, and shall maintain all <br />protective devices and signs throughout the progress of the Wark. <br />A11 trenches, excavations, or other hazards in the vicinity of the Work shall be welt <br />barricaded, and property lighted at night. When Work requires closing of an area nvrma[ly <br />used by the Owner or the public, the Contractor shall furnish, erect, and maintain temporary <br />GENERAL CONDiT10NS FOR CM AT RISK PROJECT 21 of 42 JUNE 2007 EDITION <br />
The URL can be used to link to this page
Your browser does not support the video tag.