Browse
Search
S Purchasing - Construction Manager at Risk Services for Emergency Services Facility
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
S Purchasing - Construction Manager at Risk Services for Emergency Services Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2012 11:55:35 AM
Creation date
6/23/2010 12:32:18 PM
Metadata
Fields
Template:
BOCC
Date
12/11/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4l
Document Relationships
Agenda - 12-11-2007-4l
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 12-11-2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
environmental hazards, and make such changes in the Drawings andtor Specifications as <br />they may fnd necessary to abate, remediate, isolate or handle the environmental hazards. <br />Any increase or decrease in the Contract Price or the Contract Time resulting from such <br />changes shall be adjusted in the manner provided herein for adjustments as to extra and/or <br />additional Work and changes. It 9s agreed that the Contractor shall have no liability under <br />this Agreement for any environmental hazards existing at, on or in the Project site prior to <br />the date that Work commences under this Agreement unless the Contractor or ifs <br />Subcontractors, agents or employees, acting alone or in concert with others, by their own <br />negligence or misconduct, release or expose the Owner or third parties to the <br />environmental hazards. <br />The provisions of this paragraph 5.4 shat! survive the ierm[nation ar cancellation or <br />completion of this Agreement. <br />ARTICLE fi. OTHER RECORD DOCUMEf~TS AND SUBMITTALS <br />6.'I The CMAR shall furnish to the Contractor the number of copies of Drawings and <br />Specifications stated in the Supplementary Conditions. Additional copies of Drawings and <br />Specifications maybe obtained at the cost of reproduction and handling. <br />fi.2 The Contractor shall submit to the CMAR far forwarding to the Designer alt Submittals <br />required by the Contract Documents. The Contractor shall submit four (4} reproducible <br />prints of alt shop drawings plus the number of copies sufficient for its requirements. The <br />Contractor shalt submit samples in quantities required by the Contract Documents. The <br />Contractor shall submit product data in five (5} copies, plus the number of copies sufficient <br />for the Contractor's requirements. All shop drawings shall be reviewed by the Con#ractor <br />and shaft bear the Contractor`s stamp of approval before being forwarded to the CMAR and <br />___ _ the Designer, Submittals shaft be submitted in such time as to cause no delay to the Work <br />or any part thereof and in accordance with the Contractor's Construction Schedule and <br />Suomi#taE Register. The CMAR shalt review and process the submittal with reasonable <br />promptness, noting desired corrections, if any. The CMAR shalt retain three (3} copies of <br />the submittal and shalt return the balance of the reviewed submittal to the Contractor for <br />. action. The Contractor shaft furnish any corrected submittal to the CMAR #or forwarding to <br />the Designer. The CMAR shall retain three {3} copies of the corrected submittal for the <br />records of the CMAR and the Designer, and wilt return khe balance of the reviewed <br />submittal to the Contractor. <br />Subject to paragraph 6.3 herein, no substitutions will be accepted after the bids have been <br />received. At! substitutions prior to the receipt of bids shalt be in accordance with the <br />Contract Documents. <br />The Contractor acknowledges that the processing of shop drawings and other submittals is <br />directly impacted by the clarity, completeness, and accuracy of said documents and that it <br />is the Contractor's responsibility to (i} review and coordinate each submittal with al€ other <br />related or affected Work and {ii) approve each submittal before submitting same to the <br />CMAR for approval <br />6.3 No substitutions and no deviations from any requirement of the Contract Documents shall <br />be deemed allowed unless the Contractor has specifically informed the CMAR in writing of <br />such deulatians at the time of submittal and the Designer and the Owner have given written <br />and specific approval to the substitutions or deviations. to proposing a deviation or <br />substitution, the Contractor warrants to the CMAR, notwithstanding any review, allowance <br />or approvaE by the Designer or the Owner, that the deviation or substitution is at feast equal <br />to or,better in quality and for the purpose intended, and that the Contractor shall not by <br />reason of any such review, allowance or approval be relieved from any obligafian or <br />responsibility contained in the Contract Documents. <br />GENERAL CONDITIONS 1=0R CM AT RISK PROJECT 76 of 42 JIfNE 2007 EDITION <br />
The URL can be used to link to this page
Your browser does not support the video tag.