Orange County NC Website
ART1Gf_E 1. DEIrINlTItJNS <br />1.1 Agreement - The Construction Agreement, these Generat Conditions, and any <br />Supplementary Conditions. <br />1.2 AIA -The American Institute of Architects. <br />1.3 ASTM -The American Society for Testing and Materials. <br />1.4 Beneficial Occupancy -The point at which the Project can be occupied by the Owner for its <br />intended purpose, upon achievement of Substantial Completion, as defined in paragraph <br />1.39 of these General Conditions. <br />1.5 Change Order - A written order to the Contractor signed by the CMAR, the Owner and the <br />Designer authorizing an addition, deletion, or revision in the Work andlor an adjustment In <br />the Contract. Price andlor the Contract Time issued after execution of the Construction <br />Agreement. See paragraph 14.1 of fhese General Conditions. <br />1.6 Completion Dates -Those dates identified as the Contractor's Completion Dates [n the <br />Contractor's Construction Schedule, the Master Schedule, ar elsewhere in the Contract <br />Documents. <br />1.7 Construction Agreement -The document executed by the Contractor and the CMAR to <br />formally memorialize their consent to the terms of the Agreement. <br />1.8 Construction Change Directive - A written order to the Contractor s'sgned by the CMAR, the <br />Owner and the .Designer directing an addition, deletion, or revision In the Wark after <br />execution_of the Construction Agreement, in circumstances when the parties have been <br />unable to agree on ari adjustment to the Contract Price ar the Contract Time, but the <br />CMAR directs that the Contractor proceed with said Work subject to adjustment of the <br />Contract Price andlor Contract Time under the procedures described herein. <br />1.9 Construction Manager At Risk (CMAR) -The person or firm designated as the CMAR in <br />the Contract Documents, or its authorized representatives. The agreement between the <br />CMAR and the Owner is referred io herein as the CMAR Contract_ <br />1.10 Contractor's Construction Schedule -That schedule described in Artiste 13 hereof and <br />identified as the Contractor's Construction Schedule. <br />1.11. Contract Documents -All of the documents that make up the Agreement, plus the Drawings <br />and Specifications that describe the scope of the Work, plus allowable Modifications to the <br />Contract Documents. <br />1.12 Contract Price -The total monies payable to the Contractor under the Contract Documents <br />pursuant to paragraph 15.1 of the Agreement. <br />1.13 Contract Time -The number of calendar days stated in, or computed from, the Contract <br />Documents for the completion of the Work, or any portion thereof. See, particularly, Article <br />13 hereof. Time of completion as specified therein is of the essence. The time used and <br />referred to on ,the Project wilt be that time which is observed in Hillsborough, North <br />Carolina, being Eastern Daylight Savings Time (EDT), Eastern Standard Time (ESTj, or <br />other as designated by the Designer. <br />1.14 Contractor -The Contractor shah be that party identified as such In the Agreement. <br />1.15 Days - Untess otherw'sse indicated, the term "days" shall mean consecutive catendar days. <br />GENERAL CONDITIONS FOR CM AT RISK PROJECT 3 of 42 JUNE 2007 EDITION <br />