Browse
Search
S Purchasing - Construction Manager at Risk Services for Emergency Services Facility
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
S Purchasing - Construction Manager at Risk Services for Emergency Services Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2012 11:55:35 AM
Creation date
6/23/2010 12:32:18 PM
Metadata
Fields
Template:
BOCC
Date
12/11/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4l
Document Relationships
Agenda - 12-11-2007-4l
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 12-11-2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />provide the Owner with the name of each Contractor's onsite <br />safety officer. <br />3.10.15.10 In the event of emergency affecting the safety of <br />life, the protection of Work, or the safety of adjoining properties, <br />the CMAR is hereby authorized to act at its own discretion, <br />without further authorization from anyone, to prevent such <br />threatened injury or damage. Any compensation claimed by the <br />CMAR on account of such action shall be determined as <br />provided for under Article 7 herein. <br />3.10.15.11 If reasonable precautions are inadequate to prevent <br />foreseeable bodily injury or death to persons resulting from a <br />material or substance encountered but not created on the site <br />by the CMAR or its Contractors, the CMAR shall, upon <br />recognizing the condition, immediately stop Work in the <br />affected area and report the condition to the Owner and the <br />Project property owner if different from the Owner and Project <br />Designer in writing. The Owner or Project property owner if <br />different from the Owner shall take responsibility for <br />remediation of the material or substance from the site. If the <br />CMAR claim's its progress in completing the Project is delayed <br />because of the remediation response to the site, the CMAR <br />shall file notice and a claim in accordance with this Agreement. <br />3.10.15.12 Any land-disturbing activity performed by the CMAR <br />in connection with the Project shall comply with all erosion <br />control measures set forth in the Contract Documents and any <br />additional measures which may be required in order to ensure <br />that the Project is in full compliance with the Sedimentation <br />Pollution Control Act of 1973, as implemented by Title 15, <br />North Carolina Administrative Code, Chapter 4, Sedimentation <br />Control, Subchapters 4A, 46 and 4C, as amended (15 <br />N.C.A.C. 4A, 46 and 4C). <br />3.11 Post Construction Phase <br />The CMAR shall provide the following ongoing services in <br />connection with Final Completion of the Work by the <br />Contractors: <br />3.11.1 Record Documents <br />The CMAR shall coordinate and expedite submittals of <br />information from the Contractors for preparation of record <br />Drawings and Specifications, and shall coordinate and expedite <br />the transmittal of such record documents to the Owner. <br />3.11.2 Organize and Index Ooerations and Maintenance <br />Materials <br />Prior to final completion of the Project the CMAR shall compile <br />manufacturers' operations and maintenance manuals, <br />warranties and guarantees and bind such documents in an <br />organized manner. This information shall then be provided to <br />the Owner. <br />3.11.3 Occupancv Permit <br />The CMAR shall assist the Owner and Designer in obtaining an <br />occupancy permit by accompanying govemmental officials <br />during inspections of the Project, preparing and submitting <br />documentation to governmental agencies and coordinating final <br />testing and other activities. <br />3.11.4 Occupancv Plan <br />The CMAR, in consultation with the Owner, the Designer and <br />appropriate regulatory agencies, shall prepare an Occupancy <br />Plan for the Project. This plan shall be provided to the Owner <br />at least thirty days prior to Substantial Completion. <br />3.12 Additional Services <br />The CMAR agrees to perform all tasks and functions <br />reasonably necessary to complete the services described in <br />the preceding paragraphs in this Article 3, even if not explicitly <br />described therein, unless the tasks or functions are explicitly <br />described as Additional Services in this section 3.12. At the <br />request of the Owner, the CMAR shall perform Additional <br />Services and shall be compensated for same as provided in <br />Article 7 of this Agreement. The CMAR shall perform <br />Additional Services only after the Owner and CMAR have <br />executed a written amendment to this Agreement providing for <br />such services. The following is a list of Services that might <br />reasonably be anticipated, with indication of whether the <br />specified services will be considered to be Additional Services <br />or required Services: <br />3.12.1 Services related to investigation, appraisal, or evaluation <br />of existing conditions, facilities, or equipment or determination <br />of the accuracy of existing drawings or other information <br />furnished by the Owner are required and are not Additional <br />Services; <br />3.12.2 Services related to procurement, storage, maintenance <br />and installation of Owner-fumished equipment, materials, <br />supplies and furnishings are Additional Services; provided, <br />however, that coordination and scheduling of the procurement, <br />storage, maintenance and installation of Owner-furnished <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.