S Purchasing - Construction Manager at Risk Services for Emergency Services Facility
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
S Purchasing - Construction Manager at Risk Services for Emergency Services Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2012 11:55:35 AM
Creation date
6/23/2010 12:32:18 PM
Metadata
Fields
Template:
BOCC
Date
12/11/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4l
Document Relationships
Agenda - 12-11-2007-4l
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 12-11-2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The CMAR shall verify that all required building permits, bonds, <br />insurance, labor affidavits, and waivers required for the Project <br />have been obtained. <br />3.10 Construction Phase <br />The CMAR shall be responsible for construction administration <br />and management, overall field supervision, Project safety <br />program, quality assurance, and other services needed to <br />construct the Project in the most expeditious, economical <br />manner consistent with the interests of the Owner and the <br />requirements of the Contract Documents. <br />3.10.1 Pre-Construction Conference <br />In connection with the Designer, the CMAR shall conduct a <br />Pre-Construction Conference during which the CMAR shall <br />review the reporting procedures, site operations and other <br />contractual requirements for the Project. <br />3.10.2 Onsite Management and Construction Phase <br />Communication Procedures <br />The CMAR shall provide and maintain a management team on <br />the Project site to provide contract administration and the <br />CMAR shall establish and implement coordination and <br />communication procedures among the CMAR, Owner, <br />Designer, and Contractors. <br />3.10.3 Contract Administration Procedures <br />The CMAR shall establish and implement procedures for <br />expediting and processing requests for information, shop <br />drawings, material and equipment sample submittals, <br />Contractor schedule adjustments, change orders, substitutes, <br />payment requests and the maintenance of logs. The CMAR <br />shall maintain daily job reports. The CMAR shall be the party <br />to whom requests for information, submittals, Contractor <br />schedule adjustments, substitutes, change order requests and <br />payment requests shall be submitted by the Contractors. <br />3.10.4 Project Site Meetinos <br />The CMAR shall conduct weekly coordination meetings at the <br />site with all Contractors. As set forth in the Master Schedule <br />and the Contract Documents, the CMAR shall conduct pre- <br />installation and preconstruction meetings for key components <br />of the Work. The CMAR shall conduct a monthly meeting with <br />the Owner and the Designer to update them on progress of the <br />Work. The CMAR shall record, transcribe and distribute <br />minutes of all project site meetings to all attendees, the Owner <br />and Designer. <br />3.10.5 Coordination of Other Independent Consultants <br />Technical inspection and testing required by the Designer, the <br />Owner or others shall be coordinated by the CMAR. The <br />CMAR shall be provided with a copy of all inspection and <br />testing reports on the day of the inspection or test or when <br />issued. <br />3.10.6 Contractor's Construction Schedule <br />The CMAR shall review, to the extent required by the CMAR, <br />each Contractor's Construction Schedule and shall verify that <br />the schedule is prepared in accordance with the requirements <br />of the Contract Documents and that it establishes completion <br />dates that comply with the requirements of the Master <br />Schedule. The CMAR and the Owner shall together approve <br />the Contractors for which a Construction Schedule is required. <br />3.10.7 Construction Schedule Report <br />The CMAR shall review the progress of construction of each <br />Contractor on a weekly basis, shall evaluate the percentage <br />complete of each construction activity as indicated in the <br />Contractor's Construction Schedule and shall review such <br />percentages with the Contractor. This evaluation shall serve <br />as data for input to a monthly Construction Schedule report that <br />shall be prepared and distributed to the Contractor, the Owner <br />and Designer. The report shall indicate the actual progress <br />compared to scheduled progress and shall serve as the basis <br />for the progress payment to the Contractor. The CMAR shall <br />determine and implement alternative courses of action that <br />may be necessary to achieve contract compliance by the <br />Contractor. <br />3.10.8 Recovery Schedules <br />In the event the Project is falling behind schedule, the CMAR <br />shall require each Contractor to prepare and submit a recovery <br />schedule as specified in the Contract Documents. The CMAR <br />shall review and ascertain that the Contractor is providing <br />sufficient resources to regain lost time. <br />3.10.9 Requests for Chances to the Contract Time and <br />Guaranteed Maximum Price <br />The CMAR shall review the contents of a request for changes <br />to the construction contract time or price submitted by a <br />Contractor, assemble information concerning the request and <br />endeavor to determine the cause of the request. In instances <br />where the CMAR's analysis reveals that the request is valid, <br />the CMAR shall prepare a detailed report to the Designer and <br />12 <br />