Browse
Search
S Purchasing - Construction Manager at Risk Services for Emergency Services Facility
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
S Purchasing - Construction Manager at Risk Services for Emergency Services Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2012 11:55:35 AM
Creation date
6/23/2010 12:32:18 PM
Metadata
Fields
Template:
BOCC
Date
12/11/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4l
Document Relationships
Agenda - 12-11-2007-4l
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 12-11-2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Appendix E Page 18 of 22 <br />. to the Contract between Orange County and The RESOLUTE Building Company for the Orange County <br />- Emergency Services Center <br />RE50LI~TE Orange County Emergency Services Center - GMP Proposal <br />THE RESOLUTE BUILDING COMPANY <br />Document List <br />10/17/2007 <br />Discipline ID Document Description Date Revision <br />Number <br />Drawings <br />Cover G001 Cover Sheet 10/26/07 <br /> G002 Building Data Sheet 10/26/07 <br /> G003 Life Safety Plan 10/26/07 <br /> <br />Architectural A001 Demolition Plans 10/26/07 <br /> A101 First Floor Plan 10/26/07 <br /> A102 Second Floor & Roof Plan 10/26/07 <br /> A110 Reflected Ceiling Plan 10/26/07 <br /> A200 Building Elevations 10/26/07 <br /> A301 Section through Addition and Lobby 10/26/07 <br /> A302 Section through Addition and Lobby 10/26/07 <br /> A303 Section through Elevator Hoistway and Lobby 10/26/07 <br /> A304 Sections 10/26/07 <br /> A310 Interior Sections 10/26/07 <br /> A320 Section through Addtions and Lobby 10/26/07 <br /> A500 Door & Frame Schedule 10/26/07 <br /> A501 HM Frame Details, Window Types 10/26/07 <br /> A520 Room Finish Schedule 10/26/07 <br /> A600 Casework Elevations & Sections Schedule 10/26/07 <br /> A601 Enlarged Plans Casework Elevations and Sections 10/26/07 <br /> <br />Structural S101 Foundation Plan 10/26/07 <br /> S201 Framing Plans 10/26/07 <br /> S301 General Notes 10/26/07 <br /> <br />Fire Protection FP-1 Fire Protection 10/26/07 <br /> <br />Plumbing P-1 1st Floor Plumbing Plan 10/26/07 <br /> P-2 2nd Floor Plumbing Plan 10/26/07 <br /> P-3 Water Heater Detail 10/26/07 <br /> <br />Mechanical M1 Mechanical Summary and Schedules 10/26/07 <br /> M2 First Floor Mechanical Plans 10/26/07 <br /> M3 Second Floor Mechanical Plans 10/26/07 <br /> M4 Mechanical Schematics 10/26/07 <br /> <br /> <br /> <br />1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.