Browse
Search
S Purchasing - Construction Manager at Risk Services for Emergency Services Facility
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
S Purchasing - Construction Manager at Risk Services for Emergency Services Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2012 11:55:35 AM
Creation date
6/23/2010 12:32:18 PM
Metadata
Fields
Template:
BOCC
Date
12/11/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4l
Document Relationships
Agenda - 12-11-2007-4l
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 12-11-2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Appendix E Page 16 of 22 <br />To the Contract between Orange County and The RESOLUTE Building Company for Orange County <br />Emergency Services Center <br />RE50LIllTE Orange County Emergency Services Center -GMP Proposal <br />THE RESOLUTE BUILDING COMPANY Proposal Criteria <br />2. The Proposal includes a $10,000 dollar Hardware Installation Allowance. <br />3. The Proposal includes a $3,500 dollar Allowance for a Handicap Door Operator at the <br />Main Entry. <br />Division 9: Finishes <br />1. The Proposal excludes Engineering of metal stud framing systems as it is anticipated that <br />all engineering and design shall be provided by the Owner. <br />Division 10: Miscellaneous Specialties <br />1. The Proposal includes a $500 dollar Allowance for Signage and Installation. <br />Division 15: Miscellaneous Specialties <br />HVAC Division <br />1. The Proposal includes a $300,000 dollar Allowance for HVAC. <br />Fire Protection Systems <br />1. The Proposal includes Clean Agent Fire Protection Systems. <br />2. No Automatic Fire Protection System per specification section 13930-1 is included as part <br />of the proposal. <br />Division 16: Electrical <br />1. The Proposal does not include UPS. UPS to be provided by the owner. <br />2. The Proposal excludes site parking lighting. <br />3. The Proposal does not include feeder and 3" PVC to telecommunication Facility. <br />4. Telecommunication Facility is by the owner and is not included as part of this Proposal. <br />5. The Proposal includes stub up conduits only for data, telephone and TV. No wiring for <br />these items have been included in the GMP. This is to be provided by another vendor as <br />selected by the owner. <br />H:1EXP\PROJECTSIOCESC\Appendix E\6-Proposal Cdteria.doc 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.