Browse
Search
S Purchasing - Construction Manager at Risk Services for Emergency Services Facility
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
S Purchasing - Construction Manager at Risk Services for Emergency Services Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2012 11:55:35 AM
Creation date
6/23/2010 12:32:18 PM
Metadata
Fields
Template:
BOCC
Date
12/11/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4l
Document Relationships
Agenda - 12-11-2007-4l
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 12-11-2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Appendix E Page 15 of 22 <br />• ~ To the Contract between Orange County and The RESOLUTE Building Company for Orange County <br />Emergency Services Center <br />RE50LYTE Orange County Emergency Services Center - GMP Proposal <br />Pro osal Criteria <br />THE RESOLUTE BUILDING COMPANY p <br />10. The Proposal has excluded design/consultant fees, planning fees, usage fees, impact <br />fees, development fees, capacity charges, escrows or taxes (except material sales tax). <br />11. The Proposal has excluded cleaning, testing, repairing, refurbishing, code upgrades and <br />recertification of existing systems or structures. If requested by the Owner, these items <br />may be added to the CM's scope of work later. <br />12. The Proposal has excluded any costs associated with Department of Insurance Special <br />Inspections. This should be included into the owners testing allowance. <br />13. The Proposal has excluded contingencies or allowances for the detection and removal of <br />hazardous material (i.e., asbestos, lead paint, PCB's, mold, etc.). If hazardous materials <br />are anticipated, it is recommended that the Owner consult to conduct an investigation of <br />the facility and grounds. Should unforeseen abatement be required, the CM shall reserve <br />right to claim additional contract time and costs should abatement be required once the <br />project has commenced. <br />14. The Proposal has excluded materials testing and inspections. The Proposal is based on <br />the understanding that the Owner will provide all material testing and inspections. <br />15. The Proposal has excluded contingencies or allowances for premiums in cost associated <br />with CM, Subcontract or Vendor overtime or premium time. The Proposal does account <br />for certain project components that may require brief premium time effort. <br />16. The Proposal has excluded allowances for Licensed Final Land Surveys or Certifications. <br />If requested by the Owner, this may be added to the CM's scope of work later. <br />Division 2: Sitework <br />The Proposal is based on the Owner removing and / or relocating all equipment, <br />furnishings, or other items not specifically called out on the drawings or specifications prior <br />to the project commencement date. The intent is to avoid any potential misunderstanding <br />of what is to be turned over to the Owner and what is acceptable for removal. If requested <br />by the Owner, help with removal may be added to the CM's scope of work later. <br />2. The Proposal includes Light Duty Asphalt Patching. Light Duty paving has been <br />anticipated to be 2" I-2 asphalt surfacing. Proposed cost of asphalt material has been <br />based on North Carolina Department of Transportation terminal prices. Adjustments to <br />asphalt material cost may be required at a later date to reflect the DOT index at that time. <br />3. The Proposal includes a $5000 Allowance for Two (2) Helical piers with 10k capacity as <br />shown on the contract documents. <br />Division 8: Doors and Hardware <br />The Proposal includes a $21,000 dollar Hardware Material Allowance. <br />H:\EXP\PROJECTS\OCESCWppendix E\6-Proposal Criteria.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.