Browse
Search
S Purchasing - Construction Manager at Risk Services for Emergency Services Facility
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
S Purchasing - Construction Manager at Risk Services for Emergency Services Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2012 11:55:35 AM
Creation date
6/23/2010 12:32:18 PM
Metadata
Fields
Template:
BOCC
Date
12/11/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4l
Document Relationships
Agenda - 12-11-2007-4l
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 12-11-2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~. <br />R~'CEf1/ED JAI" 3 0 Zfl08 ~ <br />~.. <br />' ~ °~' - Please return this copy to / a. - // ~ d 7 ~ <br />` '' Clerk to the Board's office for PAF y~, <br />ORANGE COUNTY AGREEMENT FOR CONSTRUCTION <br />NORTH CAROLINA MANAGER AT RISK SERVICES <br />.~ <br />..:~ , <br />This AGREEMENT is made and effective on this date: ne~ember U., ~nm <br />BETWEEN The Owner: <br />ORANGE COUNTY, NORTH CAROLINA (hereinafter referred to as "Owner" or "the Owner") <br />And the Construction Manager At Risk (hereinafter referred to as "CMAR" or "the CMAR"): <br />RESOLUTE BUILDING COMPANY, INC. <br />For services in connection with the Project known as: <br />The EMERGENCY MANAGEMENT SERVICES FACILITY, Hillsborough, North Carolina, as further <br />described in Article 2 <br />For which the Designer is: <br />CORLEY, REDFOOT, ZACK ARCHITECTS & ENGINEERS, ATTN: KEN REDFOOT, 222 CLOISTER <br />COURT, CHAPEL HILL, NC 27514 <br />The Owner and CMAR, in consideration of their mutual covenants herein, agree as set forth below: <br />TABLE OF CONTENTS <br />ARTICLE 1 -RELATIONSHIP OF THE PARTIES ......................................................................................... 4 <br />1.1 9wner and Construction Manager At Risk <br />1.2 Owner and Designer <br />1.3 CMAR and Contractors <br />1.4 Relationship of the CMAR to the Designer <br />ARTICLE 2 -PROJECT DEFINITION .......................................................................................................... 4 <br />ARTICLE 3- CONSTRUCTION MANAGER AT RISK'S SERVICES ................................................................... 4 <br />3.1 CMAR Services <br />3.2 CMAR Personnel <br />3.3 Construction Management Plan <br />3.4 Consultant Selection <br />3.5 Time Management <br />3.6 Cost Management <br />3.7 Management Information Svstem (MIST <br />3.8 Design Phase Services <br />3.9 Procurement Phase <br />3.10 Construction Phase <br />3.11 Post Construction Phase <br />
The URL can be used to link to this page
Your browser does not support the video tag.